CF-Andrew Park 2-LR 920921ATEC Associates, Inc.
11356 Mathis Avenue
Dallas, Texas 75229
(214) 556-2204
METRO 263-1681
FIELD DENSITY TESTS
Project Name: ANDRkl/BROWN PARK
Client Name: TONY CRAWFORD CONSTRUCTION
General Contractor: TONY CILAWFORD CONSTRUCTION
Test No.
Moisture
Dry Density
{PCF)
Proctor
No.
1 22.0 105.0 1677
2 18.3 107.3 1677
3 19.7 98.8 1677
4 16.4 107,4 1677
% of Proctor
Spec Actual
9O.O 97.5
90.O 99.7
90.0 91.8
90.0 99.8
(1) Test Location Established by: Grid Lines []
(2) Depth or Elev. of Test Established by: Survey []
(3) Test Conducted on: Full Time Basis
Fail
Moisture
ATEC Job No.:
Client Job No.:
Elevation/
Refer F.G.
25-02-92-06928-06
Date: Septm~aer 21, 1992
Location
Grid Coordinates
or Roadway Station
"4 Lift 80'North & 120'East of N.W. Corner of Parkin9 Lot
~ Lift 88'West & 70'North of S.E. Corner of Parkin] Lot
-4' 120'South of Manhole at North End (Retest)
-4'
60'South of Manhole at North End (Retest)
Control Points ~---)~
Grade StakesL-]
Estimation [] Contractor []
Estimation [] Contractor []
Intermittent Basis []
Proctor No. Maximum Density (PCF) Opt. Moisture (%)
1677 107.6 17.6
Stand. Proctor Mod. Proctor
Total Time:
ATEC REPRESENTATIVE John R. Travis
Remarks:
Respectful ly Submi tted,