Loading...
CF-Andrew Park 2-LR 920918ATEC Associates, Inc. I 1356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 FIELD DENSITY TESTS Project Name: ANDREI/ BROWN PARK Client Name: TONY CRAWFORD CONSTRUCTION General Contractor: TONY CRAWFORD CONSTRUCTION Test No. Moisture % Dry Density Proctor (PCF) No. 1 15.9 91.0 1677 2 13.9 93.9 1677 3 16.7 105.6 1677 4 17.8 97.1 1677 ~ of Proctor Spec I Actual 90.0 I 84.5 90.0I 87.2 90.2 (1) Teat Location Established by: Grid Lines ~ (2) Depth or Elev. of Test Established by: Survey [] (3) Test Conducted on: Full Time Basis ATEC Job No.: 25-02-92-06928-07 Client Job No.: Date: SEPTEMBER 18. 1992 Pass Fail Fail Elevation/ Location Compaction Moisture Refer F.G. Grid Coordinates or Roadway Station / -4' lO0'South of Manhole at North / / -4' 30'South of Manhole at North 1" Lift 1't Lift Landscape area lO0'North & 60'East of Parking Lot Landscape area 60'North & 80'East of Parking Lot Control Points [-'-I Estimation F'"l Contractor [] Grade Stakes[~ Estimation [] Contractor [] Intermittent Basis [] Proctor No. Maximum Density (PCF) Opt. Moisture (%) 1677 107.6 17.6 Stand. Proctor Mod. Proctor Tota) Time: 2.25 ATEC REPRESENTATIVE John R. Travis Remarks: Respectful ly Submitted.