CF-Andrew Park 2-LR 920918 (2)ATEC Associates, Inc.
11356 Mathis Avenue
Dallas, Texas 75229
(214) 556-2204
METRO 263-1681
FIELD DENSITY TESTS
Project Name: ANDREW BROWN PARK
Client Name: TONY CRAVFORD CONSTRUCTION
General Contractor: TONY CRAWFORD CONSTRUCTION
Test No.
Moisture %
16.7
16.5
Dry Density
(PCF)
96.9
95.8
Proctor
No.
1677
1677
% of Proctor
Spec I Actual
92.7
Pis
Fail
Compaction
(1) Test Location Established by: Grid Lines F--1
(2) Depth or Elev. of Test Established by: Survey []
(3) Test Conducted on: Full Time Basis
Fail
Moisture
ATEC Job No.:
Client Job No.:
25-02-92-06928-08
Date: September 18, 1992
Control Points ~--~-- Estimation r--1
Grade StakesL-] Estimation
(--1 Intermittent Basis
Elevation/
Refer F.G.
-4'
Location
Grid Coordinates
or Roadway Station
180'South of North Manhole
160'South of North Manhole
Contractor F-'-)
[] F-'I Contractor []
Proctor No. Maximum Density (PCF) Opt. Moisture (%)
1677 107.6 17.6
Stand. Proctor Mod. Proctor
Total Time: 1.5
ATEC REPRESENTATIVE John R. Travis
Remarks:
Respectful ly Submitted,