Loading...
CF-Andrew Park 2-LR 920918 (2)ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 FIELD DENSITY TESTS Project Name: ANDREW BROWN PARK Client Name: TONY CRAVFORD CONSTRUCTION General Contractor: TONY CRAWFORD CONSTRUCTION Test No. Moisture % 16.7 16.5 Dry Density (PCF) 96.9 95.8 Proctor No. 1677 1677 % of Proctor Spec I Actual 92.7 Pis Fail Compaction (1) Test Location Established by: Grid Lines F--1 (2) Depth or Elev. of Test Established by: Survey [] (3) Test Conducted on: Full Time Basis Fail Moisture ATEC Job No.: Client Job No.: 25-02-92-06928-08 Date: September 18, 1992 Control Points ~--~-- Estimation r--1 Grade StakesL-] Estimation (--1 Intermittent Basis Elevation/ Refer F.G. -4' Location Grid Coordinates or Roadway Station 180'South of North Manhole 160'South of North Manhole Contractor F-'-) [] F-'I Contractor [] Proctor No. Maximum Density (PCF) Opt. Moisture (%) 1677 107.6 17.6 Stand. Proctor Mod. Proctor Total Time: 1.5 ATEC REPRESENTATIVE John R. Travis Remarks: Respectful ly Submitted,