CF-Andrew Park 2-LR 920922ATEC Associates, Inc.
11356 Mathis Avenue
Dallas, Texas 75229
(214) 556-2204
METRO 263-1681
FIELD DENSITY TESTS
Project Name: ANDREW BROWN PARK
Client Name: TONY CRAWFORD CONSTRUCTION
General Contractor:
Test No.
Moisture %
16.0
Dry Density
(PCF)
106.6
Proctor
No.
1677
2 17.8 98.1 1677
3 19.2 97.1 16774
% of Proctor
Spec ~ Actual
90.0 99.1
90.0 91.2
90.O 90.3
(1) Test Location Established by: Grid Lines [--]
(2) Depth or Elev. of Test Established by: Survey n--)
{3) Test Conducted on: Full Time Basis
Pis
Fail
Compaction
Fail
Moisture
ATEC Job No.:
Client Job No.:
Oate: Se ~teai~er 22, 1992
Elevation/
Refer F.G.
1" Lift
2"" Lift
1" Lift
25-02-92-06928
Location
Grid Coordinates
or Roadway Station
Backfill over 8" Sanitary Sewer - STA -1+00
Backfill over 8" Sanitary Sewer - STA -1+50
Backfill over 8" Sanitary Sewer - STA -2+00
Control Points F--I Estimation
Grade Stakesr--] Estimation
~--1 Intermittent Basis
Contractor F---)
[] [] Contractor
Proctor No. Maximum Density (PCF) Opt. Moisture (%)
1667 107.6 17.6
Stand. Proctor Mod. Proctor
Total Time: 2.25
ATEC REPRESENTATIVE Fred Amini
Remarks:
Respect fully Submi tted,