Loading...
CF-Andrew Park 2-LR 920922ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 FIELD DENSITY TESTS Project Name: ANDREW BROWN PARK Client Name: TONY CRAWFORD CONSTRUCTION General Contractor: Test No. Moisture % 16.0 Dry Density (PCF) 106.6 Proctor No. 1677 2 17.8 98.1 1677 3 19.2 97.1 16774 % of Proctor Spec ~ Actual 90.0 99.1 90.0 91.2 90.O 90.3 (1) Test Location Established by: Grid Lines [--] (2) Depth or Elev. of Test Established by: Survey n--) {3) Test Conducted on: Full Time Basis Pis Fail Compaction Fail Moisture ATEC Job No.: Client Job No.: Oate: Se ~teai~er 22, 1992 Elevation/ Refer F.G. 1" Lift 2"" Lift 1" Lift 25-02-92-06928 Location Grid Coordinates or Roadway Station Backfill over 8" Sanitary Sewer - STA -1+00 Backfill over 8" Sanitary Sewer - STA -1+50 Backfill over 8" Sanitary Sewer - STA -2+00 Control Points F--I Estimation Grade Stakesr--] Estimation ~--1 Intermittent Basis Contractor F---) [] [] Contractor Proctor No. Maximum Density (PCF) Opt. Moisture (%) 1667 107.6 17.6 Stand. Proctor Mod. Proctor Total Time: 2.25 ATEC REPRESENTATIVE Fred Amini Remarks: Respect fully Submi tted,