Loading...
CF-Andrew Park 2-LR 920923ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 FIELD DENSITY TESTS Project Na~e: Andre~BrmmPark ATEC Job No.: 25-02-92-06928-09 Ctient Name: Tony Crauford Co~st. Ctient Job No.: Genera[ Contractor: Date: Test No. Moisture X Ory Oensity Proctor ~ of Proctor Pass Fail Fail ELevation/ Location (PCF) No. Compaction Moisture Refer F.G. Grid Coordinates Spec Actual or Roadway Station 1 15.01 101.4 1679 90 94.3 X F.G. 40' N OF S ManhoLe 2 15.6 105.5 1679 90 98.2 X -1' 1§0~ S of N ManhoLe 3 15.2 97.1 1679 90 90.3 X -2' 200' N of S Manhole 4 14.8 98.6 1679 90 91.1 X -2~ 80'$ of S. Manhote 5 15.1 102.7 1679 90 95.5 X -1 60' N of S ManhoLe 6 15.6 102.4 1679 90 95.2 X F.G. 20'E of NW ManhoLe 7 15.4 102.7 1679 90 95.5 X F.G. 68' W of N.9. ManhoLe (1) Test Location Estabtished by: Grid Lines [~ Controt Points I---~__ Estimation ~ Contractor [-~ (2) Depth or E[ev. of Test £stab[ished by: Survey [~ Grade StakesL---j Estimation ~ Contractor [] '3) Test Conducted on: Futt Time Basis [~] Intermittent Basis ~-] Proctor No. MaximumDensity (PCF) Opt. Moisture (X) Stand. Proctor Mod. Proctor Tota[ Time: 2.75 1677 lO7.6 17.6 E3 ~ [] ATEC REPRESENTATIVE John Travis Reearks: Respectfu[[y Sul0mitted,