Loading...
CF-Andrew Park 2-LR 920919ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 CONCRETE TEST REPORT Project: Andrew Brown Park Client: Tony Crawford Construction Date Sampled: 9/19/92 Our Report No.: 25-02-92-06928-11 Field Test Data Location of Pour when Sampled: MAN HOLE ON UTILITY LINE 30'N OF N.W. CORNER OF PARKING LOT Unit Weight (C-138) Sampled By CLIENT Time: Batched I Sampled ! Temperature: Air 1 °F Concrete Slump: ! in. Air Content (C- 143) (C- 173/C-231) Supplier/Plant I Delivery Ticket No. I Truck Number I Load Size I cu. yds. I °F Mfix ID No. i I % Water Added on Site i Gals. Strength Test Results (C-39) Type Specimeas: CYLINDERS Area: 28.27 in.2 Beam Test Data (C-78) Lab Type Date Age. Failure Strength, Avg Avg Span, Special No. Curing Teatr~i Days Load, lbs. PSI Width, in. Depth, in. Preparation in. 1-9394 LAB 9-26 7 91,000 3250 1-9395 LAB 10-17 28 1-9396 LAB 10-17 28 1-9397 LAB 10-17 H SPECIFIED STRENGTH 28 3000 Remarks: Respectfully submitted,