WA9302A-CS 970902 (3) 214 368 4950
09/82/1997 16:29 214-36,"""~'951~ NTMCCI ~J~ PAGE el
North Texas. M'unicipal 3 L/V
Construction Company, Inc.
5614 Dyer St.
Dallas, Texas 75206
214/368-6880
September 2, 1997 FAX 214/368-4950
Baldwin Insurance and Bonding VIA FAX: 972/644-8035
1201 ~ ~ve, Suite B
R ich~ Te~ 7508 l
nfion: Di~ Mon~
Kcfcnncc: Vill~c P~ay ~p 8~
Co~cll, Tcx~
D~ ~. Mom:
1 met today with Ken Crnffin, City Engineer far the City of Coppell ~ Gary Hendriclcs, with Shimek, Jacobs &
F inklea, the Engineer for the above referenced project regaldi~ .the olose out of this Contract. They asked about
the status of the claim with Bituminou,s/G,B, Team.. Controls (G~lS/iIS) for the over flow at the DcForc,st Lift
Station. Please provide me with an update as soon as'possible.
The City of Coppell is preparing a bill for us to submit to .the insurance company for payment.
Please call if you have any questions or comments.
Sincerely,
]vLicheel G. Daigr~
President
MGD/vlc ~
c: Gaxy Hendricks eth (3riftfin
Slximelc, Jacobs & FinIdea City of Coppell
Via Fax: 214/361-0204 Via Fax: 912/304-3570
CONSTRUCTION · SALES · SERVICE