Loading...
WA1004-CS140121 Rhonda Adloo From:Michael Garza Sent:Tuesday, January 21, 2014 1:17 PM To:Rhonda Adloo Subject:FW: SH 121 Waterline Rec. - RFI #1 Can you print this email for larry, for some reason it would not print from my pc. Michael Garza, P.E. Assistant Director of Engineering City of Coppell 972-304-7019 From: Rusty Parker [mailto:rparker@barsonutilities.com] Sent: Tuesday, January 21, 2014 11:36 AM To: Michael Garza Subject: SH 121 Waterline Rec. - RFI #1 Hello Michael, We are in the process of releasing materials and the following questions have arisen: A. There is a quantity of 6 – 2” Water Services for bid item 20. There is one service that we are requesting clarity on. On plan sheet 8 at Sta. 2+02.38 (at the precast vault) there appears to be a 2” service. The enlarged drawing on sheet 8 states 1-2” meter but is vague as to what line this is coming off of, and whether it is inside the vault or on the 3” line outside of the vault. Please provide a detail for this. B.We are releasing the precast vaults for production very soon (this week). It was mentioned during the pre- construction meeting that the City may have one on hand. Should I cancel production for one of the vaults? If so, will there be any additional work required to line up the proposed equipment with the City provided vault? C.The City’s specifications & details call for water lines 12”and larger to be DR-18. The contract along with the consulting engineer (TN&P) detail 12” DR-14. I would like to just double check that the approved submittal is ok? D.The City’s specification for fire hydrants (Std Detail # 4120) detail the assembly to connect to the new 12” main by a Tapping Sleeve, 6” Flg x Flg valve w/ a 6” MJxFlg Adapter connected to the valve. The consulting engineer calls out a 12”x6” TEE on the plans- (this would be MJxFlg, w/ a 6” MJ/Flg valve-normally). Which detail is correct? Thank you. Sincerely, Rusty Parker Project Manager Barson Utilities, Inc. 1