Loading...
ST9902-LR1401210 LL""CE rTECHNIC19L UP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C13 -0634 Report Date: 01/21/2014 Project: West Sandy Lake Road Location: Various Locations Client: City of Coppell Date Sampled: 01/16/2014 Sampled By: Armas, Brandon By Order Of: Walter Order Number: 1770 REPORT. Nuclear Field Density Test LAB NO: 156867 Test Method: See Below TEST RESULTS Report No: 156867 Page 1 of 3 Optimum Maximum Proctor No Proctor Date Moisture (%) Dry Density (pcf) Color / Description 148511 07/11/2013 11.2 120.6 Brown Sandy Clay 148639 -1 07/17/2013 16.6 106.2 Dark Brown Sandy Clay 148639 -2 07/17/2013 12.0 115.9 Medium Brown Sandy Clay 152198 -1 09/26/2013 12.8 115.0 Reddish Brown Clayey Sand Specification Moisture Band Specification No. Compaction, % Minimum Maximum 1 95 0.0 5.0 Location Test Lift # / No, Depth Location 1 -4' 10" Sewer Line B at Station 12 +90 2 -3' 10" Sewer Line B at Station 12 +90 3 -2' 10" Sewer Line B at Station 12 +90 4 -1' 10" Sewer Line B at Station 12 +90 5 -1' 18" Lateral F at Station 19 +50 6 -2' 24" Lateral F at Station 1 +50 7 -1' 24" Lateral F at Station 1 +50 8 -2' 18" Lateral F -10 at Station 1 +50 9 -1' 18" Lateral F -10 at Station 1 +50 10 -3' 21" Lateral F -9 at Station 1 +50 11 -2' 21" Lateral F -9 at Station 1 +50 12 -1' 21" Lateral F -9 at Station 1 +50 13 -2' 8" Line A -3 at Station 1 +50 Client: City of Coppell Attn: Mr. Rick O'Dell (1 -cc copy) Orig: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. Wet Moisture Dry Percent Density Content Density Proctor Spec. Moisture Proctor Pass (pcf) % (pcf) Number No. Deviation Density Fail 130.7 11.9 116.8 148511 1 +0.7 96.8 Pass 133.1 15.6 115.1 148511 1 +4.4 95.4 Pass 132.1 14.4 115.5 148511 1 +3.2 95.8 Pass 133.1 11.3 119.6 148511 1 +0.1 99.2 Pass 133.5 16.9 114.2 152198 -1 1 +4.1 99.3 Pass 126.9 20.4 105.4 148639 -1 1 +3.8 99.2 Pass 132.6 17.0 113.3 148639 -2 1 +5.0 97.8 Pass 118.8 16.6 101.9 148639 -1 1 +0.0 96.0 Pass 126.6 14.2 110.9 148639 -2 1 +2.2 95.7 Pass 124.3 20.6 103.1 148639 -1 1 +4.0 97.1 Pass 127.6 15.3 110.7 148639 -2 1 +3.3 95.5 Pass 121.9 17.1 104.1 148639 -1 1 +0.5 98.0 Pass 119.3 26.2 94.5 148639 -2 1 +14.2 81.5 Fail Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION. EOT GROUP Acct ID: 1770 Report Date: 01/21/2014 Project: West Sandy Lake Road Location: Various Locations Client: City of Coppell REPORT. Nuclear Field Density Test Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 File No: C13 -0634 Date Sampled: 01/16/2014 Sampled By: Armas, Brandon By Order Of: Walter Order Number: 1770 LAB NO: 156867 Test Method: See Below TEST RESULTS Report No: 156867 Page 2 of 3 Location: Test Lift # / No. Depth Location 14 -1' 8" Line A -3 at Station 1 +50 15 -3' 8" Line A -2 at Station 1 +80 16 -2' 8" Line A -2 at Station 1 +80 17 -1' 8" Line A -2 at Station 1 +80 18 -4' 30" Lateral F -7 at Station 1 +30 19 -3' 30" Lateral F -7 at Station 1 +30 20 -2' 30" Lateral F -7 at Station 1 +30 21 -1' 30" Lateral F -7 at Station 1 +30 22 -3' 24" Lateral F -6 at Station 1 +50 23 -2' 24" Lateral F -6 at Station 1 +50 24 -1' 24" Lateral F -6 at Station 1 +50 25 -2' 21" Lateral F -4 at Station 1 +40 26 -1' 21" Lateral F -4 at Station 1 +40 27 -3' 21" Lateral F -3 at Station 1 +50 28 -2' 21" Lateral F -3 at Station 1 +50 29 -1' 21" Lateral F -3 at Station 1 +50 30 -3' 18" Lateral F -2 at Station 1 +40 31 -2' 18" Lateral F -2 at Station 1 +40 32 -1' 18" Lateral F -2 at Station 1 +40 33 4 10" Sanitary Sewer B at Station 1 +40 34 -3' 10" Sanitary Sewer B at Station 1 +40 35 -2' 10" Sanitary Sewer B at Station 1 +40 36 -1' 10" Sanitary Sewer B at Station 1 +40 37 -3' 6" Sanitary Sewer SVC at Station 128.7 20.2 1 +50 38 -2' 6" Sanitary Sewer SVC at Station 100.8 Pass 1 +50 Client: City of Coppell Attn: Mr. Rick O'Dell (1 -cc copy) Orig: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. Wet Moisture Dry Percent Density Content Density Proctor Spec. Moisture Proctor Pass (pcf) % (pcf) Number No. Deviation Density Fail 124.7 25.5 99.4 148639 -2 1 +13.5 85.8 Fail 117.8 18.6 99.3 148639 -2 1 +6.6 85.7 Fail 124.3 19.1 104.4 148639 -2 1 +7.1 90.1 Fail 124.0 14.8 108.0 148639 -2 1 +2.8 93.2 Fail 128.9 20.0 107.4 148639 -1 1 +3.4 101.1 Pass 126.6 18.2 107.1 148639 -1 1 +1.6 100.8 Pass 128.3 15.6 111.0 148639 -2 1 +3.6 95.8 Pass 131.8 15.8 113.8 148639 -2 1 +3.8 98.2 Pass 125.1 20.3 104.0 148639 -1 1 +3.7 97.9 Pass 128.7 20.2 107.1 148639 -1 1 +3.6 100.8 Pass 133.5 15.4 115.7 152198 -1 1 +2.6 100.6 Pass 127.2 19.1 106.8 148639 -1 1 +2.5 100.6 Pass 130.6 17.1 111.5 152198 -1 1 +4.3 97.0 Pass 123.3 18.3 104.2 148639 -1 1 +1.7 98.1 Pass 129.3 16.1 111.4 148639 -2 1 +4.1 96.1 Pass 126.1 21.1 104.1 148639 -1 1 +4.5 98.0 Pass 130.1 16.8 111.4 152198 -1 1 +4.0 96.9 Pass 127.2 21.0 105.1 148639 -1 1 +4.4 99.0 Pass 122.2 19.2 102.5 148639 -1 1 +2.6 96.5 Pass 129.9 16.7 111.3 148639 -2 1 +4.7 96.0 Pass 124.2 16.6 106.5 148639 -1 1 +0.0 100.3 Pass 132.6 15.2 115.1 148639 -2 1 +3.2 99.3 Pass 129.7 14.7 113.1 148639 -2 1 +2.7 97.6 Pass 130.0 16.8 111.3 148639 -2 1 +4.8 96.0 Pass 132.8 16.9 113.6 148639 -2 1 +4.9 98.0 Pass Respectfully Submitted, Alliance Geotechnical Group ,l Perry C. Kakara, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION. HLLIMCE GEOTECIifllffil. OUP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C13 -0634 Date Sampled: 01/16/2014 Report Date: 01/21/2014 Sampled By: Armas, Brandon Project: West Sandy Lake Road By Order Of: Walter Location: Various Locations Order Number: 1770 Client: City of Coppell REPORT: Nuclear Field Density Test LAB NO: 156867 Test Method: See Below TEST RESULTS Report No: 156867 Page 3 of 3 Location: Test No. Lift # / Depth Wet Moisture Density Content Location (pcf) % Dry Density (pcf) Proctor Number Spec. No. Moisture Deviation Percent Proctor Density Pass Fail 39 -1' 6" Sanitary Sewer SVC at Station 127.4 18.4 107.6 148639 -1 1 +1.8 101.3 Pass 1 +50 40 -6' 10" Sanitary Sewer B at Station 4 +40 126.1 21.5 103.8 148639 -1 1 +4.9 97.7 Pass 41 -5' 10" Sanitary Sewer B at Station 4 +40 124.7 21.5 102.6 148639 -1 1 +4.9 96.6 Pass 42 -4' 10" Sanitary Sewer B at Station 4 +40 127.5 21.0 105.4 148639 -1 1 +4.4 99.2 Pass 43 -3' 10" Sanitary Sewer B at Station 4 +40 128.3 19.9 107.0 148639 -1 1 +3.3 100.8 Pass 44 -2' 10" Sanitary Sewer B at Station 4 +40 130.3 16.9 111.5 148639 -2 1 +4.9 96.2 Pass 45 -1' 10" Sanitary Sewer B at Station 4 +40 130.9 16.7 112.2 148639 -2 1 +4.7 96.8 Pass 46 -1' 18" Lateral G -4 at Station 1 +50 133.0 14.2 116.5 148511 1 +3.0 96.6 Pass 47 -6' 10" Sanitary Sewer B at Station 129.9 15.9 112.1 148639 -2 1 +3.9 96.7 Pass 10 +20 48 -5' 10" Sanitary Sewer B at Station 130.1 14.8 113.3 148639 -2 1 +2.8 97.8 Pass 10 +20 49 4 10" Sanitary Sewer B at Station 132.5 15.6 114.6 148639 -2 1 +3.6 98.9 Pass 10 +20 50 -3' 10" Sanitary Sewer B at Station 128.6 16.4 110.5 148639 -2 1 +4.4 95.3 Pass 10 +20 51 -2' 10" Sanitary Sewer B at Station 130.2 13.6 114.6 148639 -2 1 +1.6 98.9 Pass 10 +20 52 -1' 10" Sanitary Sewer B at Station 129.1 16.2 111.1 148639 -2 1 +4.2 95.9 Pass 10 +20 Gauge No.: 3717 Daily Standard Counts: 01/16/2014 DS: 2905 MS: 442 Test Methods: ASTM D6938 -10 Client: City of Coppell Attn: Mr. Rick O'Dell (1 -cc copy) Orig: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. DOES NOT CONFORM Respectfully Submitted, Alliance Geotechnical Group a Perry C. Kakara, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OFAPPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENTAN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THEADDRESSED CLIENTANDARE NOTTO BE REPRODUCED WITHOUT WRITTEN PERMISSION.