Loading...
Tax 2011C-LR140107*AE DAILY ACTIVITY REPORT CLIENT: City of Coppell 816 South Coppell Road Coppell, Texas 75019 PROJECT: Tax 2011 1 Sandy Lake Road Pavement Repair The following activities were performed: Houston 8701 John W Carpenter Freeway Austin Suite 250 Dallas, Texas 75247 Dallas 214.678.0227 Ph San Antonio 214.678.0228 Fax PROJECT NO.: DC 1' 315100 REPORT NO.: DAR6 DATE OF SERVICE: 01/07/14 AUTHORIZATION: Fred Wolfes REPORT DATE: 01 /08/14 Page I of I HVJ technician, Juan Maldonado, arrived on site at 10:00am at the request of Fred Wolfes from Pavecon Construction to visually inspect the subgrade and to obtain a sample of CTB for compressive strength testing. Upon arrival, technician met with Ishmael' from Pavecon Construction and obtained information on which trenches were ready for inspeciton: Stations 24 +00, 27 +50, 30 +00. All trenches consisted of light brown and gray sandy clay. The subgrade was dry, stiff and mostly compacted with very few chunks of clay on the surface. All trenches were excavated to a depth of approximately four feet to remove most of the unstable subgrade. Dereck Thomas with The City of Coppell was called to be notified of the inspection results. HVJ technican remained on site until the CTB arrived at 12:30pm. Ishmael with Pavecon notified technician that the CTB plant was late to begin operations because of low temperatures in the early morning. One sample of CTB was obtained from a small stockpile near Station 31 +00. Technician left the job site at I:00pm.