Loading...
Tax 2011C-LR140106ASSOCIATES DAILY ACTIVITY REPORT CLIENT: City of Coppell 816 South Coppell Road Coppell, Texas 75019 PROJECT: Tax 2011 Sandy Lake Road Pavement Repair The following activities were performed: Houston 8701 John W Carpenter Freeway Austin Suite 250 Dallas, Texas 75247 Dallas 214.678.0227 Ph San Antonio 214.678.0228 Fax PROJECT NO.: DC1315100 REPORT NO.: DAR5 DATE OF SERVICE: 01/04/14 AUTHORIZATION: Fred Wolfes REPORT DATE: 01/06/14 Page I of I HVJ technician, Mojahed Alfar, arrived on site at 8:30am at the request of Fred Wolfes from Pavecon Construction to visually inspect the subgrade and to obtain a sample of CTB for compressive strength testing. Upon arrival, HVJ technician met with Ishmael from Pavecon Construction and obtained information on which trenches were ready for inspeciton. The Stations were 38 +00, 30 +50, 28 +50 and 21 +00. Station 38 +00 appeared to be compacted, and consisted of stiff brown and dark clay and approximately four feet deep. At 9:15am one sample of CTB was obtained from a small stockpile at Station 38 +00. The other three locations were uncompacted and consisted of stiff brown gray clay with some areas of light brown sand and also contained large chunks of clay on top of the finished subgrade. HVJ technician called Derick Thomas with The City of Coppell to inform him of the results of the inspection; a message was left on his voicemail. Technician: Mojahed Alfar Aaron Pulpaneck, Laboratory/Project M aan ger Texas Firm R atiorm lumbei-Y 000846.x° martin J Iliotg"E, Depd mdnt Manager Texas Firm Registratio Number 000646 Our kuers and reports ,awe lift the excp %%c easy of 1he 6e9fl "nx uuWa; of our name mesa recewe our pnor wrinen aappmeaC our peatcrs aW repoms apply rnty to mataoip(sp tested andlor mgxv.oa:aG and ary not necessaripy indicative of ilhe qualifies of apparendy identical or similar matetjaltsy This report tnay not be reproduced, except pn 6"uH without the consent of H VJ Associates. Inc,