Loading...
Tax 2011C-LR140108q4ASSOCIATES DAILY ACTIVITY REPORT CLIENT: City of Coppell 816 South Coppelli Road Coppell, Texas 75019 PROJECT: Tax 2011 Sandy Lake Road Pavement Repair The following activities were performed. Houston 8701 John W Carpenter Freeway Austin Suite 250 Dallas, Texas 75247 Dallas 214.678.0227 Ph San Antonio 214.678.0228 Fax PROJECT NO.: DC1315100 REPORT NO.: DAR7 DATE OF SERVICE: 01/08/14 AUTHORIZATION: Fred Wolfes REPORT DATE: 01/09/14 Page I of I HVJ technician, Juan Maldonado, arrived on site at 9:00am at the request of Fred Wolfes from Pavecon Construction to visually inspect the subgrade and to obtain a sample of CTB for compressive strength testing. Upon arrival, technician met with Ishmael from Pavecon Construction to obtain information on which trench to inspect, Station 21 +00. This trench consisted of light brown and gray sandy clay. The subgrade was dry and stiff with very few small chunks of clay on the surface. The trench was mostly compacted; however, technicned noticed serveral small areas that were uncompacted. It was excavated to a depth of approximately four feet, which removed most unstable subgrade. Dereck Thomas with The City of Coppell was called to be notified of the inspection results. One sample of CTB was obtained from a small stockpile near Station 28 +50, Technician left the job site at I0:00am.