Loading...
CF-TownC CHR2-CS 970519 DEPARTMENTMEMORANDUM OF PUBLIC WORKS DATE: Monday 19 May, 1997 TO: Clay Phillips, Deputy City Manager FROM: Sheri Moino, Facilities Manage~/~ RE: TOWN CENTER ROOF REPLACEMENT As you will recall, we discussed the Town Center roof replacement enhancement during the 1997-98 budget review. It was staff's desire to determine if funds could be allocated during the present fiscal year to perform this work. Attached is the complete evaluation prepared by Price Consulting, Inc. who is a architectural/engineering firm specializing in roof and exterior restoration. This evaluation identifies the priority schedule for replacing the existing roof system at Town Center. It is staff's recommendation to retain Price Consulting, Inc. to prepare the design, construction documents, and bid specifications for the entire project. The cost breakdown for their services is reflected on Page 9 of the attachment. Design cost for this project is $9,665.00. This amount will be funded through the Building Maintenance line item 01-03-13-5110. Please advise if it is okay to proceed. cc: Ken Griffin, ACM/City Engineer ROOF AND EXTERIOR WALL EVALUATION REPORT CLIENT: CITY OF COPPELL DATE: JANUARY 16, 1997 PROJECT: CITY OF COPPELL TOWN CENTER 255 PARKWAY BOULEVARD COPPELL, TEXAS 75019 SURVEY CONDITIONS Purpose This inspection was performed in December, 1996. The purpose of the in~x:tion was to evaluate existing roof and exterior wall conditions of the City of Coppell Town Cent~ facility located at 255 Parkway Boulevard in Coppell, Texas. Project Scope Our scope of work for this evaluation included a visual condition survey; and selective coring, sampling, and testing of roof samples. The visual condition survey consisted of walking the subject roof areas and documenting thc existing conditions of the surfacing, membrane, flashings, drainage, and other related rooftop components. We also talked with on-site personnel and walked the building interior to document repot~l leak locations. Photographs of representative conditions were obtained and are presented in the Appendix. Genera! Comtr~tion The facility is a two-story building with conventional construction including brick veneer exterior with cast stone decoration belts. The facility appears to have been constructed in one (1) phase. PCI-01/97 EVALUATION REPORT PAGE I CITY OF COPPELL TOWN CENTER COPPELL, TEXAS ROOF CONSTRUCTION Cores and/or probes were performed in order to document underlying substrate conditions and constituents. The sampling (coring) and subsequent patching was performed in general accordance with procedures developed by the U.S. Army Cold Regions Research and Engineering Laboratory (CRREL). AREA SUMMARY Area Level Size Reported Age A Lower 300 sq.ft. 11 years - Single Ply B Lower 300 sq. ft. 11 years - Built-Up C Lower 300 sq.ft. 11 years - Single Ply D Lower 300 sq.ft. 11 years - Single Ply E Upper ~2,717 sq.ft./ 11 years - Imitation 14,200 sq.ft, surface Slate F Upper 5,088 sq. ft. 11 years - Built-Up The total roof area of this facility is 19,005 square feet. ROOF EXISTING CONDITION REPORT Reported Leaks Site personnel reported seven (7) active roof leaks in the facility (See enclosed roof plan). Roof Membrane and Assembly Areas A, C and D: Single ply roof membrane in to fair condition. poor Exhibits loss of ductility. Resistance to puncture low. Hail easily punctures membrane and causes leaks. Future service will require additional main~ on a continual basis. The service life could be extended approximntely three O) years by active observation and maintenance. Replacement when possible is suggested. PCI-01/97 EVALUATION REPORT PAGE 2 CITY OF COPPELL TOWN CENTER I COPPELL, TEXAS Area B: Asphalt built-up roof. The three-ply built-up roof is in fair to poor condition. The flashings will require repair or replacement. The roof exhibits wear. The service life could be extended approximately five (5) years with active observation and maintenance. Each year will require more maintenance and the threat of interior finish damage increases each year. Replacement when possible is suggested. Area E: Infitation slate shingles. The roof assembly appears to be in fair condition. The corrugated metal deck appears to be in good condition. It is not possible to determine if the corrugated metal deck is partially or fully covered with wood without removing a large area of shingles at additional cost. PCI inspected deck under an area of removed shingles and confirmed the lower perimeter is plywood. The wood substrate would be expected to have sustained some water damage in various locations, requiring some repair. The roof system has failed and waterproof integrity has been lost. The shingles are very brittle and are cracking and breaking. These broken and loose tiles are potential hazards as they can/may become airborne in heavy winds or slide down the roof pitch and drop to the ground. Once separated f~om the roof, a leak is The shingles have tested positive for asbestos. The overall appearance of the shingle is poor. Repairs are noticeable at best. Repairs will continue and frequency of repairs will escalate. Replacement is suggested if financially feasible. PCI-01/97 EVALUATION REPORT PAGE 3 CITY OF COPPELL TOWN CENTER COPPELL, TEXAS Area F: Upper asphalt built-up. The three ply built-up asphalt roof over a concrete deck is in fair to poor condition. The perimeter and projection flashings exhibit wear and should be replaced as soon as possible. The roof expansion joint is in need of replacement and should be replaced during future reroofing operation. The upper built-up roof service life could be extended up to five (5) years by repairing and replacing flashings as required. The system will demand more maintenance each year; observation and active maintenance will be required to protect interior finishes. Replacement is suggested in the future as it becomes financially feasible. Sheet Metal Fabrieafiom Metal fabrications are in fair condition. Refastening and sealing in conjunction with rework and roof replacement are suggested. The top coping at the shingled mansard should be modified and replaced. Deflection and failure at various locations appear to contribute to moisture intrusion affecting interior finishes. Drainage Systems Drains should be checked and cleared if necessary. Asbestos Containing Materials (ACM) Roof and flashing core samples were taken for asbestos content analysis. Terranext Laboratories analyzed the samples via NVLAP approved polariz~ light mi~py and found detectable ACM in the built-up roof flashings in Area F (see Lab sample 1-97- 2~.a.~.~.) and imitation slate in Area E (see Lab sample 1-97-24526). PCI-01/97 EVALUATION REPORT PAGE 4 CITY OF COPPELL TOWN CENTER COPPELL, TEXAS Visual inspection indicates that the membrane and flashings are in a non-friable condition. Careful removal procedures can prevent the materials from becoming friable and reduce the requirements for abatement procedures. Air monitoring, complete disposal documentation, compliance with local, state and Federal OSHA guidelines is recommended. Allowance for air monitoring and disposal during abatement is included in the budget estimate. EXTERIOR WALL SYSTEM EXISTING CONDITION REPORT General Construction The exterior facade is in fair condition. The brick masonry and accent stone will require cleaning and miscellaneous pointing in the future. Openings and intersections of dissimilar materials will require new sealants in the future. The decorative wood fascia at the roof perimeter will require immediate mi:mir in m least eight (8) locations. Futaher examination at the time of repair could indicate the need for additional repairs. A general cleaning and resealing of the exterior facade should be scheduled in the near SUMMARY OF EXISTING CONDITIONS AND RECOMMENDATIONS Roof System The existing conditions, as determined by our inspection and evaluation indicate that all roof areas on this facility are in need of replacement to maintain a watertight building condition over an extended period to time. The optimum remedial action requires design of, and specification for, new roof systems, considering value received for expenditures incurred. Exterior Wall Based upon field tests and the existing waterproofing conditions our evaluation has determined that the sealants and dampproofmg systems are not performing satisfactorily on this facility and require minor repair with planned expenditures on masonry pointing, sealants, cleaning and masonry sealing in the near future. Cracks in masonry joints and joints of dissimilar materials exist and must be repaired to prevent major cost expenditures in the future. PCI-01D7 EVALUATION REPORT PAGE S CITY OF COPPELL TOWN CENTER COPPELL, TEXAS Design Criteria Applicable Building Code Requirements · Underwriter's Laboratories Requirements for Class A Roof Assembly Factory Mutual Requirements for 1-90 Resistance to Wind Uplift · Recommendations of NRCA and SMACNA · Manufacturer's Published Requirements for Specified Warranty · Neighborhood Association Criteria DESIGN CONSIDERATIONS The following conditions were noted which at'feet the roof system performance and should be addressed in the design phase of any future repair or renovation project on this facility: · Interior wall comers of Roof Area F need EPDM flashing to insure closure. Work recommended on or before Year 3. PCI-01/97 EVALUATION REPORT PAGE 6 CITY OF COPPELL TOWN CENTER COPPELL, TEXAS Facility Repair Priority Emergency Leak Repairs Priority: 1 Remedial Repairs Priority: 1 (Wood Fascia) Reroof Priority: 1 (Area E) Waterproofing: 2 Sheet Metal Priority: 1 Roof Replacement by Priority Roof Areas A, C and D Priority 2 Roof Area B Priority 3 Roof Area E Priority 1 Roof Area F Priority 3 Schedule by Year Year One: Reroof Area E: Asbestos Abatement: $28,000 Reshingle 35,500 Sheet Metal 9,510 $ 73,010 Wood Fascia: 8 each Locations $ 8,000 Caulk & Paint Wood Perimeter 6,950 $14,950 Total Year One: $ 87,960 Year Two: Reroof Areas A, C and D: $ 3,600 $ 3,600 Masonry Repairs: Misc. Brick Pointing $ 3,500 Clean Building 7,500 Caulk Building 9,500 Clear Sealer 6,255 Coat Plaster & Misc. 5,500 Total Year Two: $ 35,855 PCI-01/97 EVALUATION REPORT PAGE 7 CITY OF COPPELL ~~___.. TOWN CENTER COPPELL, TEXAS Year Three: Reroof Areas B and F: $ 30,000 EPDM Flashing Closure for Wall Comers of Roof Area F: 2,400 $ 32,400 Total Year Three: $ 32,400 Subtotal - Three Year Program $156~215 Bonds ~ 2% $ 3,124 Subtotal $159339 Contingency ~ 10% $ 15,934 Total Construction Costs $175.273 PCI-01t~7 EVALUATION REPORT PAGE 8 CITY OF COPPELL ~ TOWN CENTER o~.c.~c~,s ..... COPPELL, TEXAS II. Project Costs Design, Construction Documents, f ~ Bidding and Negotiations ~ $ 3,515 $ 3,100 $ 3 Project Management during Construction $ 2,345 $1,830 $1,730 Field Inspector Services at $300/visit with 10% increase per year Subtotal $ 5,860 $ 4,930 $ 4,780 $ 15~570 TOTAL PROJECT BUDGET/COST ESTIMATE $190,843 NOTES: 1. Project budget/cost estimates are approximate assumptions based upon current labor and material rates for the geographic location. Cost estimates are typically plus or minus 5% of the actual project cost. PCI-01/97 EVALUATION ~PORT PAGE 9