Loading...
NL Woodlands Retail Center fees DEVELOPMENT FEES PROJECT NAME: Northlake Woodlands Center, Lot 2 Block A ENGINEER:Kadleck & Assoc ORIGINATION DATE:1/29/2014 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee$2,403.00 Wastewater Impact Fee$1,503.00 Park Fee$0.00 ROW dedicationRoadway Impact-Zonewaived Street Sign Street Light Construction Inspection$3,941.06$3,941.06ra2/24/2014 EG or Bore Permit Overtime Inspection Water Tap Inspection$100.00 Wastewater Tap Inspection$50.00 Water Meter (Domestic)$299.25 Water Meter (Fire/Irrig)$178.50 Meter Deposit (Domestic)$30.00 Meter Deposit (Fire/Irrig)$30.00 Utility Final Inspection$50.00 Subtotal to Eng.$3,941.06$3,941.06$0.00 Total FeesFees PaidAmount Owed TOTALS $8,584.81$3,941.06$4,643.75 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint. - - -- - -- -- - - , l N CASH 096749 RECEIPT Date -2 1 Received From t_ it CS /NA 1_,-; K, ( / i £ i ,, / Address No r:: iii i iLic t- 1,i o .1 0 t i-.1o__ I.,,:'c ci, 1 ,_ , ,i ( r Dollars For For I'' el N / I( ii ' I- , C p 0 :0-If; HOW PAID I, CM ACCOUNT 1:= AMT OF ACCOUNT CASH • IF l!' AMT PAjy /I i . / r ,•-'ii,.,,f I 1 r, ,, - BALANCE ' MONEY ORDER D k By DUE CREDIT CARED 1 THE FACE OF THIS DOCUMENT HAS A COLORED BACKGROUND ON WHITE PAPER AND ORIGINAL DOCUMENT SECURITY SCREEN ON BACK WITH PADLOCK SECURITY ICON. Crestone Realty, LLC Grand Bank d/b/a Holmes Commercial Dallas,TX 75370 225 East State Hwy 121,Suite 120 Coppell,TX 75019 32-2454/1110 2/19/2014 214-488-5200 PAY TO THE City of Coppell **3,941.06 ORDER OF $ Three Thousand Nine Hundred Forty-One and 06/100***""**"**"***"***"***""*"*****"**"""*"***"""**""""*"""*"*""""**"** DOLLARS ,Security features City of Coppell II IZZ,back PO Box 9478 225 Parkway Blvd. Coppell, TX 75019 Void after 90 days ---'Lk---.4't MEMO IvP AUTHORIZED SIGNATURE . , Crestone Realty, LLC 20096 City of Coppell 2/19/2014 Date Type Reference Original Amt. Balance Due Discount Payment 2/19/2014 Bill 420 inspection fees 3,941.06 3,941.06 3,941.06 Check Amount 3,941.06 Bank Acct-Grand Ba 3,941.06 HOLMES COMMERCIAL February 3, 2014 .............. rnpa(:�,J fee of $41728,,54 walived Mr. Michael Garza for dedcabon of City of Coppell �ROW for ':�3ethd 265 Parkway Boulevard sc'hod. PO Box 9478 Cop ell, Texas 75019 RE: ROW DedicAn & City Fees for Northlake Woodlands Center Retail As part of our planned development conditions, we are deeding 2,401 square feet • our property to the City of Coppell for future Right of Way (see attached Exhibit "A"). This is approximately 7% of our small infill site. We recognize that Right of Way dedication is a common development practice in the City of Coppell. However, due to the size of this site, dedicating this 7% of our property creates a hardship for us 2s developers. We respectfully request that the Coppell City Council waive all our city-required fees, including those listed in the attached Exhibit "B". The property in the Right of Way is being purchased for $16.98 per square foot, which is a total of $40,769 (see Exhibit "C"). We estimate our city-required fees will be approximately $15,039. We are grateful for the opportunity to begin another commercial project in Coppell. We believe this project will be a great asset to the tenants at Northlake Woodlands Center Retail and the City of Coppell for years to come. We look forward to once again working with the City of Coppell on this project, UEDROMM IMMU= 225 E a s t Ili 11 g h mi a y 1 2 1 , S u i t o 1201, C o p) p e� 1, To x a s 7501 9 T H E • C I T Y • 0 F COPPELL - k.4 *. x A s I a 9 January 29,2014 David Hayes Holmes Commercial RE: Northlake Woodlands Lot 2 Blk. A Fee Assessment Letter Dear Mr. Hayes Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of$4,728.54 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer Impact Fees are due and payable at the issuance of a Building Permit. Also, please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to scheduling a pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions,please contact me. Sincerely, Michael Garza,P.E. Assistant Director of Engineering cc: Jennifer Miller,Finance Director Ashley Owens,Administrative Technician, Building Inspections Glenn Hollowell,Public Works Manager Tim Oates, Deputy Chief/Prevention Brad Reid, Director of Parks and Recreation Michael Arellano, Chief Building Official A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV DEVELOPMENT FEE TABLE Project: Northlake Woodland Center lot 2 Blk.A Date: 1/29/2014 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $2,403.00 (100%due at Issuance of Building Permit) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $299.25 (100%due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $178.50 (100%due at Issuance of Water Meter) Water Meter Deposit(Domestic) $30.00 (100%due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100%due at Issuance of Water Meter) Wastewater Impact Fee $1,503.00 (100%due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100%due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100%due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100%due prior to Filing Plat) Roadway Impact Fee $4,728.54 $4,728.54 (100% due prior to Filing Plat) Street Light Fee Information not Available (100%due prior to Acceptance of Project) II Street Sign Fee Information not Available (100%due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100%due prior to Start of Construction) II TOTAL $9,372.29 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $4,728.54 DEVELOPMENT FEE WORKSHEET PROJECT: Northlake Woodland Center lot 2 Blk.A DATE: 1/29/2014 Water Impact Fee: Domestic Meter(s): 1 - 1 inch = 1.67 ESU's Irrigation Meter(s): 1 -5/8 inch X 3/4 inch = 1 ESU's 0 = 0 ESU's Fireline Meter(s): 0 = 0 ESU's Total#: 2.67 ESU's @$900.00 ea. $2,403.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total#: 2 Connections @$50.00 ea. $100.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total#: 1 Domestic Meter(s)@ $299.25 $299.25 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) (This fee may change at the time of pick up) Irrigation/Fireline Water Meter Fee: Total#: 1 Irrigation Meter(s) @ $178.50 $178.50 Total#: 0 Additional Irrigation Meter(s)@ $0.00 $0.00 Total#: 0 Fireline Meter(s)@ $0.00 meter provided by developer (100%due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total#: 1 Meter(s)@$30.00 ea. $30.00 (100%due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total#: 1 Meter(s)@$30.00 ea. $30.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 1.67 @$900.00 ea. $1,503.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total#: 1 Connections @$50.00 ea. $50.00 (100%due prior to issuance of building permit) Utility Final Inspection Fee(All developments): Total#: 1 Lots @$50.00 ea. $50.00 (100%due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee(For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 0 Single-family @ $0.00 per lot $0.00 0 Multi-family @ $0.00 per unit $0.00 (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $4,728.54 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after Oncor submits the lighting plan for the proposed development. Once the plans are submitted, $352.44 per light will be assessed. (100%due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2%of development cost required for private improvements) (4%of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Northlake Woodland Center lot 2 Blk.A DATE: 1/29/2014 ROADWAY IMPACT FEE: Service Area * 1 Category** Retail/Commercial Land Use** Commercial Others Not Specified Building Area(sf) 4,941 Development Units** 4.94 Vehicle Miles per Development Unit** 6.38 Fee per Vehicle Mile *** $150 Roadway Impact Fee due=(Development Units)x (Vehicle Miles per Development Unit)x(Fee per Vehicle Mile)= $4,728.54 *(Figure 4.1 -Roadway Impact Fee Study) **(Table 4.10-Roadway Impact Fee Study) ***(Schedule 2,Page 3 -The Master Fee Schedule)