Loading...
DR1201-CS140130 T H E C I T Y O F COPPEktLL ^ , * A S 1 8 9 January 30,2014 Larry Frazier The Fain Group 1616 N. Sylvania Av Fort Worth TX 76111 RE: Project#DR 12-01,Creekview Dr.Retaining Wall&Roadway Improvements Dear Mr. Frazier: During the course of construction on the above referenced project, several things were not performed as specified. Based on our prior communications, you and your staff should all be aware of this situation. These items include: lack of air entrainment in the concrete pavement, no compaction in the subgrade for over%2 of the hand pour area and damage/gouges to the existing pavement. The City has reviewed the emailed documents from Redi-Mix dated 12-5-13 and we object to the conclusions listed. Specifically, ASTM C-94 mentions when there is a specified concrete strength of 5000 PSI or greater, then the amount of air entrainment can be decreased by 1%; however, this project specified a concrete strength of 3,600 PSI for the slip-form areas. In reality, there is an inverse correlation between air entrainment and concrete strength: for every 1% of entrained air there is a decrease in strength by 5%. In response to The Fain Group's failure to address the City's concerns on all three items, we herein require a 5 year maintenance bond instead of our 2 year standard. Otherwise, the City will request that The Fain Group develop a schedule to repair and replace the areas of pavement that were not built as specified in the contract documents. If you have any questions or need any additional information, please feel free to contact Larry Davis, Construction Inspector,at(972) 304-3684. Sincerely, George arshall,P.E. Civil Engineer Office 972-304-3562 Fax 972-304-3570 gmarshall@coppelltx.gov cc: Michael Garza,P.E.,Assistant Director of Engineering Larry Davis,Construction Inspector A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV