Blackberry Farm-CS140130
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Blackberry Farm, Final Plat,
a final plat to subdivide 54.8 acres of property to
permit the development of 82 single-family lots and five (5) common area lots
located on the north side of Sandy Lake Road, approximately 750 feet northeast
of Starleaf Street (extended), at the request of Creststone Group, Ltd., being
represented by L. Lynn Kadleck, Kadleck & Associates.
STAFF REP.: Marcie Diamond PROJECT ID# FPR-14-0004
DRC DATE:
January 30, 2014 and February 6, 2014
CONTACT:
Michael Garza, P.E., Asst. Director of Engineering, 972-304-7019
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. There will be additional comments during detailed engineering plan review.
2. What is the status of the CLOMR and the wetlands determination?
3. All drainage easements in common areas will be maintained by HOA.
4. Add a water line stub out between lots 8&9 Block D and include it in a utility easement.
5. What happened to the access easement at the end of Huckleberry Ct?
6. Clear up the dimensions on Detail “A”.
7. Add the CLOMR case number on the floodplain.
8. Show the existing floodplain line.