Loading...
Sherrill L3-CS140218 T N E • C 1 T Y • O F COPPELL r,a o F 9 A A S 1 8 MEMORANDUM To: Jennifer Miller, Director of Finance From: Ken Griffin, P.E., Director of Engineering and Public Works Date: February 14, 2014 Reference: Lot 3 Block 1, Sherrill Acres Roadway Impact fee refund The roadway impact fee of$4,662.30 was paid in 2005 for this development but the development never moved forward. In 2013, the development returned and was assessed a fee of$12,202.91 for the roadway impact. On 2/14/2014, the developer paid the $12,202.91 not realizing that there was a portion that had already been paid in 2005. I request a refund check in the amount of$4,662.30 be made to: Tri-Star Construction, Inc. 3601 Yucca Dr. Bldg. 2 Flower Mound, TX 75028 Thank you for your attention to this matter. 1