ST0502A-CS140218 T H E • C 1 T Y • O F
COPPELL
x n s s
February 18, 2014
William Taylor, Chief Estimator
CD Builders, Inc.
9008 Trinity Boulevard
Fort Worth, TX 76053
RE: Construction Contracts for Freeport Parkway ST-05-02A
(Ruby Rd. To West Sandy Lake Rd.)
Dear Mr. Taylor:
The above referenced contract was awarded by Council on February 11, 2014. Enclosed
are three (3) contracts for you to sign and return to the Engineering Department. After
being fully executed, an original contract will be sent back to you for your records.
If you have any questions or need any additional information, please call me at your
convenience.
Since -
za, P.E.
Yry Assistant Director of Engineering
972-304-7019
mgarza@coppelltx.gov
Enclosures
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673