Loading...
CF-Fire Station 2-CS000720 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: COPPELL FIRE STATION NO. 2, SITE PLAN AMENDMENT P & Z HEARING DATE: July 20, 2000 C.C. HEARING DATE: August 8, 2000 LOCATION: 366 S. MacArthur Boulevard. SIZE OF AREA: Approximately 1.51 acres of property. CURRENT ZONING: SF-7 (Single Family-7) REQUEST: Site Plan amendment to allow a 1500 gallon fuel storage tank and a seven foot high brick screening fence. APPLICANT: City of Coppell Mark Brochtrup, Fleet Services Manager 111 DeForest Road Coppell, Texas 75019 (972) 304-3555 Fax: (972) 304-3547 HISTORY: This is the site of Fire Station//2, built approximately 2 years ago. TRANSPORTATION: MacArthur Boulevard is a concrete, four lane divided thoroughfare designated as a P6D, which has potential to be a six-lane divided thoroughfare contained within 110 feet of right of way. SURROUNDING LAND USE & ZONING: North- MacArthur Park and church; SF-7 South -MacArthur Park and vacant; SF-7 and LI East - MacArthur Park; SF-7 West -single-family neighborhood; SF-9 COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for park/open space uses. Item # 9 DISCUSSION: This is a request to add an above grade fuel storage tank to Fire Station//2. This proposal shows the tank behind a 7 foot brick screening wall, and will appear to be an addition to the existing building. The 7 foot fence is to ensure the fuel tank (at 4 feet in height) will not be visible from the front of the building. The brick will be identical to the existing Station, and will duplicate the look of the building. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends approval of the amendment to the existing site plan in that the tank is needed and the design solution of completely screening it will respect the architectural integrity of the existing station. ALTERNATIVES: 1) Recommend approval of the request. 2) Recommend disapproval of the request. 3) Recommend modification of the request. 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) Cover sheet and reduced site plan 2) Enlargement of fence and tank location 3) Dimensions of fuel storage tank 4) Elevation of screening wall 5) TXU comments Item # 9 Comments for the City of Coppell Development Review Committee June 28,2000 Coppell Fire Station Number 2 Site Plan Acceptable The City of Coplbell will be responsible for costs associated with relocating any TXU Electric & Gas facilities that may be in conflict with the proposed construction. Please contact David Dean at 972-323-8907 to discuss location of existing TXU Electric & Gas facilities. JeffCun-).' JUN 29 '"" ji