Loading...
E-Care Coppell-CS140217 Adams February 17, 2014 Mr. Michael Garza, P.E. via email: mgarza @coppelltx.gov Assistant Director of Engineering City of Coppell 265 Parkway Blvd, Coppell, TX 75019 RE: Texas Bank Addition Lot 1R2-R Block A (E-Care) Construction Plan Review Comments Dear Mr. Garza, We are in receipt of the review comments dated February 14, 2014. We reviewed the comments and have revised the submission or provided comment as follows, please note the original comment numbers correspond to the below revised comment numbers. CONSTRUCTION PLAN REVIEW COMMENTS: GENERAL: 1. Remove all city details from plan set; the contractor is required to have a copy of our details onsite at all times. Keep only project specific non-city details in the plan set. City Details removed as requested. 2. Add the legal description to cover sheet. Added as requested. UTILITY PLAN (SHEET 6.0): 1. Include the fire vault and water meters in a utility easement. Note added for utility easement as requested. 910 S.Kimball Avenue• Southlake.Texas 76092 City of Coppell 817.328.3200•FAX 817.328.3299 TBPE Reg.No.F-1002;www.adams-engineering.com Adams City of Colwell — Final Construction Plans 1. Three (3) sets of the revised 24"x36"Construction Plans Please forward any comments to jack.garner @adams-engineering.com. Thank you for your time and consideration regarding this project. Please do not hesitate to contact us with any questions. Sincerely, ADAMS NGINEERING Jack H. Garner, Jr., P.E. Project Manager Cc: Jeffery Medici, Medici Development Partners (email: jeff @medicidp.com) Craig Wedeman, Curtis Group Architects (email: CWedeman @cga-arch.com) 910 S.Kimball Avenue•Southlake,Texas 76092 City of Coppell 817.328.3200•FAX 817.328.3299 TBPE Reg.No.F-1002;www.adams-engineering.com