MA1009-PN120118 5' WALLS ON OTHER SIDE OF CANAL
H ' 1, •' �GNT�p __, _ s w•oEGH iR OWNED BY OTHERS AND ARE SHOWING NEED
- - OA ENCE —
I \ co„ ••�N �,� coNC 5/va _ --__ - REPAIR
`\ \ - -- -
CONC.SIDEWALK
� \ \`� 5= _ _4,0 qK
—� _ _ t ECiI OF STREAM — +axe D-_
L- _ _ vin
II _
I�. \ _ _� _ aria \ _ _ _ _ —_tea — _ - - - - - - - - - _ - - -_— _ 7-
ill
°�o
�- -- 451— 4sz ��^I i Q
956= 957 _ 1 G
���tl.,� 960963 ♦ - -- 963 ._ Y u Y
'� C VP,'f � .� 'S'WROUGHT�Y I _II - _ .. - S WOOD FENCE 6'WOOD FENCE 6 WROUGHT IRON(ENCE 5'WOOD fi WOOD IRON M
' 1,
EXISTING WALL TO BE REPLACED FENCE FENCE
�o° SECTION OF WALL MISSING SECTION OF WALL MISSING
END OF WALL i.
e / DRAINAGE FLUME TO BE
CONSTRUCTION AT 48"DIA DRAIN PIPE TO BE CONNECTED TO WALL
EXISTING HEADWALL oI
\ \�,/ i 'V CONNECTED TO WALL a� +rte
m 30 15 0 30 60
CONSTRUCTION ACCESS THROUGH THIS ALLEY =NMI
S
s-
Sd
tl
319
11
r e a • c t r r o r SCALE TEAGUE NALL AND PERKINS CITY OF COPPELL,TEXAS ir9vaROxa
HOW This document is for interim review and is not CPL11248
COPPELL SHOWN " intended for construction, bidding or pe mit DESIGN CONCEPTS SHEET
x SHOWN Purposes.
N/A 1 2 1 6 0 Abrams Road, suite 508 0 8 18-Jan-12 ALEX CANAL IMPROVEMENTS
DEL'1N BLACK, P.E. DATE:
-� �* �. m> DATE //�/C, Dallas, Texas 75243 TX. REG. k 31640 PLAN VIEW OF WALL 1
_ _ PAane:(2 f4)481-9887•Pe x:(214)481-8884 OF
1 NO. REVISION BY DATE e x A s t 9 9 JAN 2012 TBPE Registration N4 F-230 www.tnp-onlins.com 7
APPROXIMATE LOCATION OF NEAREST BUILDING WALLS \
I GENERAL DESCRIPTION
LI
°�J • A ROCK BASE WOULD FIRST BE PLACED IN FRONT OF
22.-6"± S'-0"t
THE EXISTING WALL TO SERVE AS A WORKING
PLATFORM AND COFFERDAM
• SOIL NAILS WOULD BE INSTALLED AS THE EXISTING
4 WALL IS REMOVED AND A TEMPORARY WALL FACING
PROPOSED 1 r— — OF SHOTCRETE PLACED TO RETAIN THE SOIL
SOIL NAIL WALL FINISHED GRADE — --- ( • A CAST-IN-PLACE CONCRETE WALL WOULD THEN BE
CONSTRUCTED APPROXIMATELY — PLACED CONNECTED TO THE SOIL NAILS INCLUDING A
IN THE SAME ALIGNMENT AS THE -'- LEDGE FOR SUPPORTING THE STONE FACIA
EXISTING WALL \ THE STONE VENEER WOULD BE INSTALLED
\\\ • FILL WOULD BE PLACED ON THE SLOPE ABOVE THE
ls'a^t 1 r--- APPROXIMATE EXISTING WALL TO FLATTEN THE SLOPE TO 4 HORIZONTAL TO 1
GROUND LINE
VERTICAL AND SOD INSTALLED
4 • AFTER THE WALL IS COMPLETED THE IMPORTED ROCK
FLEXIBLE WATER BARRIER Q "- WOULD BE REMOVED FROM THE SITE
SHEET • THE AREA ABOVE THE WALL BE GRADED AND SODDED
'-7
I- y ,
ROCK FOR WORK PLATFORM STONE VENEER J C
AND COFFERDAM TO BE REMOVED
AFTER THE WALL IS COMPLETED __ --
> __
__ SOIL NAILS
CAST-IN-PLACE_.///// \_
___ —--____--'- REINFORCED CONCRETE
SHOTCRETE TEMPORARY
WALL FACING
1 SOIL NAIL ALTERNATE 4' D 4'
ESTIMATED COST$929,830
ADVANTAGES DISADVANTAGES
• BASIC ALIGNMENT OF WALL IS MAINTAINED • LOSS OF FLOW AREA MAY HAVE A SMALL
EFFECT ON HYDRAULICS DURING
• DOES NOT REQUIRE EXCAVATION BETWEEN CONSTRUCTION
WALL AND PROPERTY LINE
• CONSTRUCTION COST HIGHER THAN
• HEIGHT OF WALL ABOVE NORMAL WATER OPTION 5, CONSTRUCTED BY LOWERING
g LINE IS LESS THAN OTHER ALTERNATES WATER LEVEL
• LOWEST CONSTRUCTION COST OF
ALTERNATES CONSTRUCTED WITHOUT
LOWERING WTER LEVEL
a • CAN BE CONSTRUCTED WITHOUT LOWERING
WATER LEVEL AND ENDANGERING THE
_ WALL ON THE OTHER SIDE
SCALE
T " ` . ` ' T Y . ° ' TEAGUE NALL AND PERKINS review CITY OF COPPELL,TEXAS CPL11248
COPPELL This document for interim r w and is not
AS SHOWN intended for construction, bidding or permit DESIGN CONCEPTS SHEET
°�"' purposes. ALEX CANAL IMPROVEMENTS
1 2 1 6 0 Abrams r a m a R o a d, $u I t A 5 0 8 DELVIN BLACK,P.E. DATE: 18-]an-12
. . :;,....,s., * V„ A,, DA E //VC. Dallas, r e X a s 75243 OPTION 1 - SOIL NAIL WALL ON EXISTING Z
r --,t �o Phone:(214)461-9867•Fax:(214)461-9864 TX. REG. K 31640
NO. REVISION BY DATE X s. : l 9 9 JAN 2012 TBPE Registration No.F-230 www.tnp-onllne.com ALIGNMENT
APPROXIMATE LOCATION OF NEAREST BUILDING WALLS GENERAL DESCRIPTION
�I j • SHEET PILING OR OTHER MEANS OF RESTRAINING THE
WATER FROM THE CANAL WOULD BE INSTALLED
�
Iz • AN ACCESS ROADWAY WOULD BE PREPARED ABOVE THE
s'-D"t EXISTING WALL
PEDESTRAIN RAIL • EXCAVATION AND INSTALLATION OF THE WALL WOULD
PROCEED FROM THE NORTH END TO THE SOUTH
REDI-ROCK CONCRETE BLOCKS OR EQUIVALENT PROPOSED • TEMPORARY SHORING WOULD BE INSTALLED BETWEEN
4 THE WALL AND THE PROPERTY LINE AS REQUIRED AS
WITH AN ASHLAR STONE PATTERN CAST IN THE FINISHED GRADE //
FACE OF THE BLOCKS EXCAVATION PROGRESSED
• THE MODULAR BLOCKS AND ASSOCIATED BACKFILL
3 WOULD BE PLACED TO THE FULL HEIGHT OF THE WALL
,i AS CONSTRUCTION PROCEEDED SOUTHWARD
'� ,E=_____- APPROXIMATE EXISTING 1
GROUND LINE I • AFTER THE WALL IS COMPLETED THE EXISTING WALL
EXISTING WALL TO BE REMOVED _1, AND SHEET PILING WOULD BE REMOVED
• THE PEDESTRAIN RAIL BE INSTALLED
SHEET TO BE REMOVED • THE AREA ABOVE THE WALL BE GRADED AND SODDED
AFTFTE OF ER COMPLETION WALL —y
FREE DRAINING
n GRANULAR BACKFILL
<>
/1
__ CRUSHED STONE BASE
I-
•��r4-2i•��-��2ir�iri %,
I
3'-6"±
191-0"±
20,0"t
22,6"±
Z LARGE MODULAR BLOCK WALL OPTION
ESTIMATED COST$958,375 4 ° 4'
ADVANTAGES
DISADVANTAGES
• CONSTRUCTION TIME SHOULD BE LESS THAN OTHER •ALTERNATES SINCE CONSTRUCTING THE WALL IS A REQUIRES EXCAVATION NEAR PROPERTY
PROCESS OSF TACKING BLOCKS AND BACKFILLING LINE
• LESS LABOR INTENSIVE AND FEWER CONSTRUCTION • PATTERN FORMED IN FACE OF BLOCKS
WILL DIFFER FROM EXISTING WALL
TRADES INVOLVED
• CAN BE CONSTRUCTED WITHOUT LOWERING WATER • CONSTRUCTUION COST IS HIGHER THAN
LEVEL AND ENDANGERING THE WALL ON THE OTHER OPTION 1
SIDE
• CONSTRUCTION COST IS HIGHER THAN
E.
OPTION 1
ig
T H ! C I T Y • C 1. SCALE
COPPSHOWN TEAGUE AND PERKINS his document is for interim review and is not CITY OF COPPELL,TEXAS 1NPP PROJECT
ELL _ NALL K/NS CPL11248
intended for construction, bidding or permit
° � * _ ;,-,- N/A 1218 0 Abrams R o e d, Purposes. DESIGN CONCEPTS
T �_; DATE Suite i f A 5 0 8 DELVIN BLACK, P.E. DATE: 18-Jan-12
ALEX CANAL IMPROVEMENTS SHEET
NO. o //�/C. ( a l l s a, Texas (7524 3 TX. REG. N 31640 OPTION 2 - LARGE MODULAR BLOCK GRAVITY 3
OR
REVISION BY DATE x A s , e e JAN 2012 7BPE Registration Na F-230 Phane:Dall s, B7•Fa x:(2 f4)�B7-8E8�
www.tnp-onlIne.com
WALL 7
APPROXIMATE LOCATION OF NEAREST BUILDING WALLS GENERAL DESCRIPTION
I • SHEET PILING OR OTHER MEANS OF RESTRAINING
0 THE WATER WOULD BE INSTALLED IN FRONT OF THE
s'-6^t 16'-0"t °I� EXISTING WALL
• THE DRILLED SHAFTS WOULD BE INSTALLED ALONG
PEDESTRAIN RAIL F-0"* THE NEW WALL ALIGNMENT WITH TIEBACKS AS
REQUIRED
PROPOSED I • THE AREA BETWEEN THE EXISTING WALLS WOULD BE
FINISHED GRADE 4 — EXCAVATED INSTALLING LAGGING BEHIND THE
1 r ■ rI DRILLED SHAFTS AS EXCAVATION EXTENDED
wl
STONE VENEER FINISH Z DOWNWARD
�r r 1[ --- �h • THE REINFORCED CONCRETE WALL SEGMENTS
L REINFORCED CONCRETE BETWEEN THE DRILLED SHAFTS WITH A LEDGE TO
EXISTING WALL I / WALL FACE SUPPORT THE STONE VENEER WOULD BE INSTALLED
APPROXIMATE EXISTING I • THE STONE VENEER BE INSTALLED
TO BE REMOVED ,r GROUND LINE 1
i /// STONE • THE EXISTING WALL AND SHEET PILING WOULD BE
SHEET]PEEING TO BE REMOVED "s _ I VENEER REMOVED
A� COMPLETION OF WALL r • THE PEDESTRAIN RAIL INSTALLED
TIE-BACK
L I I • THE AREA ABOVE THE WALL BE GRADED&SODDED
.I —�SHORIORARY 1\ ` /\NG v z
O
VI z
z,�
_ EXISTING WALL a
r TO BE REMOV WATER BAf�RIER TEMOROARY w¢f
RE IRCED CONCRETE WALL SHEET SHORING z o OO 0
ATT• ED TO DRILLED SHAFTS
DRILLED DIA. SHAFT aw 8
30"DIA ASSUMED FOR ci a o\\ ,1J COST COMPARISON
12
/�
V �
■
r.--1. DRILLED SHAFT SUPPORTED WALL 4' 0 4.
ESTIMATED COST$1,173,480
ADVANTAGES DISADVANTAGES
• RESULTS IN THE LARGEST FACTOR OF SAFETY • REQUIRES MORE HEAVY EQUIPMENT
FOR GLOBAL STABILITY OPERATING BEHIND EXISTING WALL
• CAN BE CONSTRUCTED WITHOUT LOWERING • HIGHEST CONSTRUCTION COST
WATER LEVEL AND ENDANGERING THE WALL ON
a
THE OTHER SIDE
T M e • C I T Y • o ! SCALE
COPPELL TEAGUE NALL AND PERKINS CITY OF COPPELL,TEXAS "'"°E
SHOWN This document is for interim review and is not CPL11248
vEaT intended for construction, bidding or permit DESIGN CONCEPTS
N/A 12760 Abrams Road, Suite 508 purposes.
SHEET
* j�' ' DATE INC. Dallas, Texas 752 4 3 DEIVIN BLACK, P.E. DATE: 18-Jan-12 ALEX CANAL IMPROVEMENTS
Phone:(214)�B1-8 p- n Fsx:(214)SB1-88B� TX. PEG. R 31640 OPTION 3- DRILLED SHAFT SUPPORTED WALL 4
A NO. REVISION BY DATE T 'Y n s t s 9 JAN 2012 WE Rep1a68tlon Na F-230
www.tnp-onllne.com OF
7
APPROXIMATE LOCATION OF NEAREST BUILDING WALLS GENERAL DESCRIPTION
—..„,,,,,i
II • A SHEET PILING OR OTHER MEANS OF RESTRAINING
THE WATER WOULD BE PLACED IN FRONT OF THE
PEDESTRAIN RAIL 9 I EXISTING WALL
6'-10^ °I? • THE ALIGNMENT WOULD BE SET BACK FROM THE
s'-o^t EXISTING WALL A SUFFICIENT DISTANCE TO ALLOW
CONSTRUCTION OF THE NEW WALL
PROPOSED • SOIL NAILS WOULD BE INSTALLED AS THE
STONE VENEER FINISH FINISHED GRADE
.....// _ EXCAVATION PROCEEDED DOWNWARD AND A
1 I-- I TEMPORARY WALL FACING OF SHOTCRETE PLACED TO
RESTRAIN THE SOIL
APPROXIMATE EXISTING
• A CAST-IN-PLACE CONCRETE WALL WOULD THEN BE
PLACED CONNECTED TO THE SOIL NAILS INCLUDING A
GROUND LINE
LEDGE FOR SUPPORTING THE STONE VENEER
EXISTING WALL
__ii • THE STONE VENEER WOULD BE INSTALLED
TO BE REMOVED 1 3,, • THE PEDESTRAIN RAIL BE INSTALLED
T • FILL WOULD BE PLACED ON THE SLOPE ABOVE THE
SHEET COMPLETION E BE REMOVED WALL TO FLATTEN THE SLOPE TO 4 HORIZONTAL TO 1
AFTER COMPLETION OF WALL VERTICAL AND SOD INSTALLED
SOIL NAIL WALL • AFTER THE WALL IS COMPLETED THE EXISTING WALL
—__— AND TEMPORARY SHORING WOULD BE REMOVED
STONE VENEER
— �� SOIL NAILS
5 __ —
_ CAST-IN-PLACE
REINFORCED CONCRETE
H 12-0"t SHOTCRETE TEMPORARY
WALL FACING
4 SOIL NAIL WALL
ESTIMATED COST$1,060,510 4 4
ADVANTAGES
DISADVANTAGES
• INCREASES WATER SURFACE AREA, STORAGE REQUIRES EASEMENTS FOR EXTENDING SOIL NAILS BEYOND
VOLUME, AND HYDRAULIC CAPACITY PROPERTY LINE
• CAN BE CONSTRUCTED WITHOUT LOWERING • REQUIRES A RELATIVELY LARGE OFFSET FROM THE EXISTING WALL
WATER LEVEL AND ENDANGERING THE WALL ON ALIGNMENT
THE OTHER SIDE
E
• TOP OF WALL IS CONSIDERABLY HIGHER ABOVE NORMAL WATER
LEVEL THAN EXISTING WALL
• A RELATIVELY SHORT SECTION OF WALL ON THE SOUTH END WILL
REQUIRE A DIFFERENT TYPE OF CONSTRUCTION
s
• UNKNOWN COST AND TIME DELAY TO ACQUIRE EASEMENTS FOR
SOIL NAILS
• DIFFICULT TO REMOVE EXISTING WALL AFTER NEW WALL IS
COMPLETED
x rx . . � , TY . o � � TEAGUENA�COPPELL AND PERK/NS CITY OF COPPELL,TEXAS """0 AS SHOWN This document is for interim review and is not CPL11248
o vEar intended for construction• bidding or permit DESIGN CONCEPTS N/A 72760 Abrams Rosd, Suite 608 Purposes. SHEET
� 'f = DATE 75243 DELVN BLACK, P.E. DATE: 18-Jan-12 ALEX CANAL IMPROVEMENTS 5▪ NO. REVISION f MD
NC. Dallas,l s 8, T a x e s TX. REG. 31640
9 Phone:(214)461-9867•Tex ine.co1<J481-9886 OPTION 4- SOIL NAIL WALL OFFSET FROM
BY DATE X q s 1 s )AN 2012 RIPE Registration Na F-230
www.lnp-onllns.com EXISTING ALIGNMENT 7
7
APPROXIMATE LOCATION OF NEAREST BUILDING WALLS
GENERAL DESCRIPTION
THIS ALTERNATE ONLY RECOMMENDED IF
PERFORMED IN CONDUCTION WITH REPAIRS/ • THE WATER SURFACE IN THE CANAL WOULD LOWERED
REPLACEMENT OF THE THE WALL ON THE 51 BY APPROXIMATELY 3 FEET AND MAINTAINED AT THAT
OTHER SIDE OF THE CANAL
Lk, LEVEL WHILE WORK ON THE WALL WAS PERFORMED
22,6"± a n s'-o^± • A ROCK BASE WOULD BE PLACED IN FRONT OF THE
EXISTING WALL TO SERVE AS A WORKING PLATFORM
AND A COFFERDAM
I • SOIL NAILS WOULD BE INSTALLED AS THE EXISTING
4 ------ WALL IS REMOVED AND A TEMPORARY WALL FACING
PROPOSED 1 1--- - I OF SHOTCRETE PLACED TO RESTRAIN THE SOIL
SOIL NAIL WALL FINISHED GRADE A CAST-IN-PLACE CONCRETE WALL WOULD THEN BE
CONSTRUCTED SAME ALIGNMENT HE --/ --- / ' • PLACED CONNECTED TO THE SOIL NAILS INCLUDING A
IN THE SAME ALIGNMENT AS THE L I
IXISTING WALL LEDGE FOR SUPPORTING THE STONE FACIA
APPROXIMATE EXISTING • FILL WOULD BE PLACED ON THE SLOPE ABOVE THE
— GROUND LINE WALL TO FLATTEN THE SLOPE TO 4 HORIZONTAL TO 1
1 r
I VERTICAL AND SOD INSTALLED
Y
1 • AFTER THE WALL IS COMPLETED THE IMPORTED ROCK
18'-0"± < • THOEUWATER LEVEL WOULD THE MTHEN BE ALLOWED TO
I
',7 RETURN TO ITS NORMAL ELEVATION
+4 FLEXIBLE WATER BARRIER -- /
F., SHEET STONE VENEER
V
— CAST-IN-PLACE SOIL NAILS
______——_ REINFORCED CONCRETE���///
ROCK FOR WORK PLATFORM WALL FACING
TEMPORARY
AND COFFERDAM TO BE REMOVED WALL FACING
LOWERED WATER SURFACE AFTER THE WALL IS COMPLETED
O SOIL NAIL ALTERNATE 2
4'
0 4'
ESTIMATED COST$743,380
ADVANTAGES DISADVANTAGES
• BASIC ALIGNMENT OF WALL IS MAINTAINED • LOSS OF FLOW AREA MAY HAVE A SMALL
EFFECT
• DOES NOT REQUIRE EXCAVATION BETWEEN CONSTRUCTION
WALL AND PROPERTY LINE
• DANGER OF CAUSING DAMAGE TO WALL ON
I
• PROVIDES A SAFER WORK ENVIRONMENT THE OTHER SIDE OF THE CANAL
• CONSTRUCTABILITY IS MORE CERTAIN
• LOWEST CONSTRUCTION COST
IE
SCALE
as TX � C , T . 0 � TEAGUENALLANDPERK/NS
: CITY OF COPPELL,TEXAS TNP PROJECT
COPPELL AS SHOWN This document is for interim review and is not CPL31248
'a vtzT intended for construction, bidding or permit DESIGN CONCEPTS SHEET
N/A purposes.
t2teo Abrams Road, Suite 50 8 ALEX CANAL IMPROVEMENTS
DELVIN BLACK, P.E. DATE: 18-Jan-12
6
-c r * o DATE ANC Dallas, Texas 7524 3 TX. REG. p 31640
PAOne:(214)4e1-9867.P•x:(2is�set-gees OPTION S-SOIL NAIL WALL& LOWERING
@ X q g a
s t JAN 2012 1BPeRgbaatlonN F-230 www.tnp-onhIne.com WATER LEVEL
OF
NO. REVISION BY DATE
7
APPROXIMATE LOCATION OF NEAREST BUILDING WALLS�. GENERAL DESCRIPTION
THIS ALTERNATE ONLY RECOMMENDED IF • THE WATER SURFACE IN THE CANAL WOULD LOWERED
PERFORMED IN CONDUCTION WITH REPAIRS/ 0 I BY APPROXIMATELY 3 FEET AND MAINTAINED AT THAT
REPLACEMENT OF THE THE WALL ON THE o�u LEVEL WHILE WORK ON THE WALL WAS PERFORMED
OTHER SIDE OF THE CANAL a •-0"t • A ROCK BASE WOULD BE PLACED IN FRONT OF THE
EXISTING WALL TO SERVE AS A WORKING PLATFORM
AND A COFFERDAM
• THE EXISTING WALL WOULD BE REMOVED
4 • EXCAVATION AND INSTALLATION OF THE WALL WOULD
1 F— I PROCEED FROM THE NORTH END TO THE SOUTH
PROPOSED COMPLETING THE WALL AS CONSTRUCTION PROCEEDED
REDI-ROCK CONCRETE BLOCKS OR EQUIVALENT FINISHED GRADE
WITH AN ASHLAR STONE PATTERN CAST IN THE SOUTHWARD INCLUDING REMOVAL OF THE EXISTING
FACE OF THE BLOCKS 3 – WALL AND SHEET PILING
1 APPROXIMATE EXISTING
—
------ GROUND LINE
EXISTING WALL TO BE REMOVED
v
I
_
C7
Y _
0
1e'-0,t v��
M=LEXIBLE WATER BARRIER FREE DRAINING
`� v SHEET / — i �!-1 GRANULAR BACKFILL
--- i I�
use.
ROCK FOR WORK PLATFORM
AND COFFERDAM TO BE REMOVED
LOWERED WATER SURFACE AFTER THE WALL IS COMPLETED
20'-0"t
22'-6"t
6 LARGE MODULAR BLOCK WALL OPTION
ESTIMATED COST$970,750 a 0 a
ADVANTAGES DISADVANTAGES
• BASIC ALIGNMENT OF WALL IS MAINTAINED • LOSS OF FLOW AREA MAY HAVE A SMALL
EXCAVATION EFFECT ON HYDRAULICS DURING
• XCAVATION BETWEEN WALL AND CONSTRUCTION
PROPERTY LINE LESS THAN OPTION 2
PROVIDES A SAFER WORK ENVIRONMENT • HIGHER CONSTRUCTION COST THAN
• THAN OPTION 2 OPTION 5
• REQUIRES EXCAVATION BETWEEN WALL
AND PROPERTY LINE
• DANGER OF CAUSING DAMAGE TO WALL ON
THE OTHER SIDE BY LOWERING WATER
LEVEL
r x s - c r r • o R SCALE
r7 i
COPPELL TEAGUE NALL AND PERKINS CITY OF COPPELL,TEXAS NPL11"
AS SHOWN This document is for interim review and is not CPL112a8
vExr intended for construction, bidding or permit DESIGN CONCEPTS
a N/A 12160 A b r a m s Road, Suite 508
purposes. ALEX CANAL IMPROVEMENTS SHEET
AL T *,�^'--'o DATE ANC Dallas, Texas 75243 DELNN BLACK, P.E. DATE: 18-Jan-12
TX. REG. /31640
NO. REVISION BY DATE X -;s , 0 9 JAN 2012 WE PAone:(214)461-8867•
lIne.c214)461-9884 OPTION 6- LARGE MODULAR BLOCK WALL&
Registration Na F230 www.tnp-onlIne.com
LOWERING WATER LEVEL �