CF-Fire Station 2-CS 961211 Phillips Swager Associates December 11, 1996 Chief Jimmy Godwin ~ ................... Coppell Fire Department 500 Southwestern Blvd. Coppell, Texas 75019 Re: Coppell Fire Stations No. 2 and 3 Coppell, Texas PSA Project No. 4110.00 Dear Chief Godwin: We just wanted to keep you updated on our findings as Phillips Swager Associates (PSA) monitors the concrete at Fire Station No. 3. Last week, PSA issued a letter to Boyd Construction stating that we would monitor the floor and pavement concrete for shrinkage cracks, because we learned from Mr. Thompson at ATEC Associates, Inc. that the concrete which was placed did not meet the slump requirements Set forth in the project specifiCations. PSA visited the. site yesterday and reviewed the conditions of both the slab and drives. We found no signs of cracking in the floor slab. Critical areas such as building corners and edges of the apparatus bay trench drains were looked at carefully. We also reviewed the concrete drives, and we specifically looked for the crack Mr. Davis informed us about. We could not f'md that crack because it is probably covered up by stored construction materials. We will continue to look for this specific crack. The portions of the concrete drive we could review showed no signs of cracking. PSA will continue to monitor the concrete but, in our opinion, we do not foresee any major problems occurring in the future. Mr. Jimmy Godwin December 11, 1996 Page 2 If you have any questions, please do not hesitate to call. Sincerely, PHILLIPS SWAGER ASSOCIATES Dirk M. Dalhausser, AIA Associate ils/411000/ljg2-y3 pc: Chief John Linstrom/C.F.D Mr. Larry Davis/C.O.C. Mr. Lee Stone/C. O.C. Mr. $. ThompsordATEC Mr. Greg SchordPSA