Loading...
CF-Fire Station 2-CS 96120912404 Park Central Drive, Suite 240 est for Proposal Dallas, TX 75251-1819 .~ ~._~__~.~.~L~J{. ~'~ "~ RFP No. 06 To: Boyd Construction Project. ' - COppea ~t= ohiaons No. 2 & 3 1110 W. Harris, Suite 126 City of Coppell Arlington, TX. PSA Project No. 4110.00 General: A. This-RFP is issued to define the scope of the proposed modification in Drawings and Specifications for a contemplated Change Order to the subject Contract. The work required by this modification, when duly authorized, shall be executed in accordance with the Genea'al Requirements of the original Contract Documents. B. No work shall be started until receipt of an authorization in the form of a Change Order. C. Please prepare and submit for review a Proposal for change in the Contract Amount and time for the modification to work herein described in accordance with the Contract Documents of _this Contract. Description of Proposed Modification: 1. Provide 6' concrete encasement at 4' plumbing line under concrete drive at Fire Station No. 3 (Mac site). Drawings Attached: RFP06-1 Copies to: Chief Linstrom/CFD Prepared by: Dirk M. Dalhausser, AIA Chief Godwin/CFD Project File Date: December 9, 1996 j~lx41 l{100Xrfl~M}3