CF-Arts Center-PL 990217CONTRACTOR'S OBLIGATION · Replace broken glass inserts in front display room doors room 113 · Complete parking lot installation and striping as identified by Inspector Larry Davis · Complete ADA ramp at entrance of Arts Center · Install building letters "Center for the Arts" as shown on elevation plan · Provide rough grade at rear of storage building · Patch all holes in ceilings around fixtures and smoke detectors/sprinkler heads throughout · Replace or paint stained ceiling tile in formal room 113 · Paint window frame in formal room 113 · Clean up stove in kitchen room 112 · Seal around men's room water closet and urinal (room 116) · Repair broken urinal (1 st one) in men's room 116 · Patch hole(s) in brick where utilities were abandoned (theatre room 128) · Remove all abandoned utilities in theatre room 128 · Install 7 programmable thermostats (remove all abandoned or broken thermostats) · Relocate overflow drain line in women's room 108 to drain over lavatory · Add joist hangers in storage room 127 (6 additional ones required) · Install weather stripping at theatre exit room 128 (double doors) · Install panic bar hardware at theatre exit room 128 · Install ivory wall covers on all abandoned outlets throughout · Relocate HVAC grills as depicted on attached addendum in theatre room 128 · Install curtain rod in make-up room 119 · Paint plywood above lockers in make-up room 119 · Trim storage room entry where brick meets building with wood (room 127) · Provide building plaque with names furnished to Tim Keck by Sheri Moino OWNER'S OBLIGATION · Abandon plumbing in kitchen 112 where ice maker was located and cap off drain · Relocate two exit lights in theatre (room 128) (should be complete 2/18/99) · Complete installation of fire protection system from vault to building and tap into city's utilities (should be complete 2/20/99) · Cap off clothes washer/dryer connections in room 123 and cover drywall opening. Cut floor bolts where sink was located in room 123 · Paint exposed metal trim in formal room · Relamp all existing light fixtures throughout to include exit lights · Remove abandoned electrical conduit and cap off at floor in room