Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Cambridge Phase 1-LR 940628
J-~ EOTECH NICAL J E JNGINEERING I E JNVIRONMENTAL. GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Method: ASTM D2922 D~017 I)698 Page 1 of 1 Client: Be~mer Development Company Me~l ~ M~.OO ~i~ ~t) ~ (~) Pmj~: ~ of C~b~e ~r ~ l I, D~ Gray ~ C~y 10L1 Test Date: J~e 28, 1~ 2. Bm~ C~y~ ~d 107.1 14~ Repo~ Dam: Jm 28, 1~ 3. D~ G~y ~W C~y ~.6 21.1 Requi~d Demity (~): 95% ~ 1~% R~qui~d Moism~ (~):~3%, O~m +~% No. ~ ~ M~ T~t No. ~t) C~ (~) 3 ~t 6, Bl~k A, 5~ 191 98.1 21.6 103.7 2 Pdnc~ ~wa~ ~e, Station 0+50, 5~ lift 192 1~.2 12.5 101.9 1 ~t 1, Bilk E, 5~ 193 105.4 19.0 104.2 6" 2 ~t 3, Bilk E, 3~ li~ 194 1~.3 17.3 1~.1 ! ~t 5, Block E, 3~ lift 195 105.7 19.1 104.5 6~ All lesls listed aS.0vq meet the por~ect requirements Bill Anderson - Dowdy, Anderson and Associates, lnc ,~//// /1 / '~ ///. l~rry Davis - City of Coppell