Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Cambridge Phase 1-LR 940628 (2)
EOTECHNICAL GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Method: ASTM D2922 D3017 D698 Page 1 of Client: Benmer D~v~lopm~u~ Company Project: ~t~ of C~b~e ~or ~ I 1. D~ G~y ~ C~ 101.1 14~ Te~ Dam: J~e ]7, 1~ 2. Repoa Da~: J~e 28, 1994 3. Y~ B~ ~ ~ve G~ C~ ~ 114~ 9~ Requi~d Density (~): ~% to 105% 4. Y~ Requi~d Moism~ (~):&3%, O~m 5. D~ G~y ~ C~y ~.6 21.1 6. Gray ~e ~ 24.0 7. Y~ B~ ~ Lig~ G~y ~ 103.9 8.4 No. ~ ~ M~ C~ T~t ~t) ~ (%) No. I ~t 10, Bilk B, 2nd li~ 1~ ~.5 17.0 98.4 I ~t 3, Bl~k E, 2~ 189 1~.2 17.7 103.1 I ~t 5, Bilk E, 2nd lift 190 104.9 18.8 1~.8 ¢¢: Bill Anderson 7 Dowdy, Anderson and Associates, Inc. Larry Davis - City of Col}poll