WA9302A-CS 970707 214 368 4950
. 87!B. 7/1997 88: 2G 214-368.""~,950 NTMCCI ~ PAGE el
North Tern Municit~ Cg..nstrut~.on Corntinny, Inc.
561.4 ~er Stret
l'}allt ~. 75206
(2 14) ~6~-6880
Fax (214)
~TelecoO_ler Cover Sheet
TO: City of Coppen DATE: 07/07/97
A'ITN: Larry Daivs TIME: 09:14 AM
];AX NO: 972/304-3570
I"ROM: VieMe Cola
MESSAGE: Re: Villa~ Parkway Pump Station.
C:o~ell, Texas
]tollowing please find the progress r~lmm for July 2 and 3, 1997 we retA~ed from GE T~atn
Controls regarding the abov~ rt, f~etw. rA project,
Pie, rise call trt~ ff you hav~ any questions or comm~
T'hank you.
TOTAL NUhlBFI OF PAGES INCLUDIN(].-C"C)VE,R SHRRT: 3
87/B7/1997 88:26 214-368-4958 NTMCCI
-TO: [Vlikc, L) N_lex A ,-,v,,, vv,, .....,, .......· ...... I PAGE 82
21 16 · 'i': '.
P~OO:RES'S RI~IK~>RT
· ?72/9? ' '
· 7: 3,', PaSe re~eived f~'om ~,/ill~ge park,~,a>, P.8. :..~Ret~ni~ page I was inronued by La~, Davis that
o[~erat ors ,,'ere e~p~nenci~ difficultyin in~r~~ info~ation provided by ~e Sensephone
Autodi a let. He ~]so Rsked t~ I dis~ss op'~ation 'o'f p~pS 5&6 u~ith Te~ Weirant. I askgd if ~ may
c~tl him back. I was on a ceh phone.'. I did wh~ !'~ived 'at ~i Controls.
· 11 -t'~C Phon~ call from Mike Diag i~o~ me 'i~t cat3; of Coppall was initiating 24 ~. monitoring of
SC.~A system, " ' '.' "..Y.
· ..~t~ernool~ TeleDAC ~ncea ~iVed from'~utm~.'.].oe OibsOn, ~.~ CONTROLS. & TeleDAC
prot;ceded to Village P~kxvay to i.n~;eSti~"Cg~ig~tign~ Of W~91 ~..~te~ evaluation it ~'as detem~ined
theft t~e dialoat softwazo wins parrot.trig properly.bUt '~'.pe8ing prorider PageNet u~s not e~6ri~ to
1'.~ protocol - ·
· Pac~s xx'ere issued to another se~ice"succeS'a'full),while PggeNet pages were ~auccessful for the most
pa~. , .
· TEA~I Controls committed tg.~oViding f~.'atphan~ pagers ~iced by anothe~ provid~ to
~:enrim~ or deny problems wi~h Pag~N~t. 8el~ct~ pe~s6~1%viII ca~ both th~ PageNet peger and th~
addttlcnal ]~er in orde~ to c~nfi~ or deny ini~al..~ndi~;
· T~I~DAC fo~d no substantial problems xvith th~.C0p~l!:.oonfi~etion but did give valuable inst~otion
k3 .roe G~bson and Gilbe~ Cable. TE~ Con~Ols. in ~r to mexim~ze the applications ability to
reliably r~pon
2 1
COPPBLL .S C.adDA FRO,rF, CT
PROORESS REI:'(DRT
"713/97
· Sug,~es txon.t to the Coppel l TeleDAC application provided by the repres~ntativei of the TeleDAC Co.
were in~plemented. '
· Four pa,.3ers ~en~iced by AT&T wireles~ were acluired ,.nd inte~ated into the dialout sequence for alarms
and t,~rxk level r%oziirk~.
· Lni[i,l] test,i~ revealed Xmproved throughput. with AT&T. In f. ct, Pa~eNet repeatedly caused the Wingl 1
paging module to loCk up. To .viod unnece$-,a~ lockup-., which would cause critical alsrrns to be ignored
the F~eNet pager~ were eliminated from the hourly tank lever broad~mm~t pim{~e.
· AT&T l>~8ers were a~signed firit call on the emergency ¢allou( hst,
· The city of Coppell received three AT&T paigerN to be d{~tr~bit~d amon~ designated personnell-
· l"E.~\ 1 control.~ received one AT&T pa~er in order to monitor paging.
· ?roject tecItnicial sup!0on was h.~nded off to Dimvial Smith (TEAM), lot Oib~on will be on vacation the
week of