Loading...
Coppell BC3-LR010330REPORT OF REINFORCING"STEEL INSPECTION 8901 Caq~nter Ftwy~ Suit~ #100 Dallas, Texas 75247 Date of Service: 03/30/01 Client No.: 1332 Client: Constructors & Associates 3333 Welborn St, Suite 200 Dallas, TX 75219 Report No.: Project No.: Project: 94001487.0037 94001487 Charles Schwab 217 Wrangler Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: .~rt Locations/Items Inspected: Four (4) Columns, SW corner of build Test Method: Visual Observation REPORT OF INSPECTION ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ~lacing Drawings Approved X 3ar Length and Shape X Column Tied Prope~y X 5ar Size X Proper Bar Placement X =T~es and Spac~ X 3~ ~ X ~o~ r,~ X ~a~p sp~n~rrype X ~ebar Cman X c~n~l Bar~ in ~8ce X Naded Sp~ces ~o~rn Cman X Proper Bar Suppo~s X ~echar~cal Sp~ces ~u~ of e,~ X L~o~ s~,~s X ,.,~ co¥,~ X Discrepancies/Comments: No discrepancies noted at the time of inspection. Technician: J. Tipton Started: 1:30 p.m. Reoort Distribution: (1) Constructors & Associates (!) City of Coppell - Constr. lnsp. (!) City of Coppell - Bldg. lasp, 309sds Stopped: 2:30 p.m. 4"~Eric J. Cleveland, P. E. Senior Project Engineer This report is exclusively fo~ the use of the client indicated above and shall not be rapmduced in full without written aptly'oval of HBC Engineering, Inc.