Loading...
Coppell BC3-LR010228,REPORT OF DRILLED BELLED ,,~,_R INSPECTION Client: Constructors & Associates Attn: Mike Donnelly 3333 Welborn St Suite 200 Dallas TX 75219 Report Date: Project: Service Date: Project Number: Report Number: F_.NGINEEI{ING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 February 28, 2001 Charles Schwab 217 Wrangler Coppell, Texas February 19, 2001 94001487 94001487.0017 Services:Drilled belled pierinspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier inspection. See attached sheets for recorded data. NOTE: The contractor vibrated the upper 5 feet of the piers when placing concrete. Technician: Mike Shields Report Distribution: (1) Constructors & Associates (1) City of Coppell - Constr. Insp. (1) City of Coppell- Bldg. Insp. Reviewed by: Senior Project Engineer The tests were performed in general accordance with applicable ASTM test methods. This-report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparenlly similar or identical materials. Page 1 of I ~-~,~ REPORT OF DRILLED BELLED PIERS 8901 Carpenter Frwy., Suim #100 Dallas, Texas 75247 Project: Charles Schwab - Equipment Yard Report No.: 94001487.0017 217 Wrangler, Coppell, Texas Date of Service: 02/19/01 Project No.: 94001487 Technician: M. Shields Driller: Page: 1 of 3 Pier Identification 3 11 19 12 5 14 20 21 22 26 23 Pier Diameter (in.) 24 24 24 24 24 24 24 16 16 16 16 Bell Diameter (in.) 54 54 48 54 54 54 48 36 36 36 36 *Top of Pier Elevation (ft) 98.0 98.0 98.0 98.0 98.0 98.0 98.0 98.0 98.0 98.0 98.0 Req. Depth from Exist. Grade (ft) 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 Initial Depth of Pier from Existing Grade {ft) 18.0 18.5 18,2 18.7 20.6 18.0 18.0 19.6 20.0 20.0 19.0 Final Depth of Pier from Existing Grade (ft) 18.0 18.5 18.3 18.7 20.6 18.0 18.0 19.6 20.0 20.0 19.0 Depth from Top of Concrete (ft) 17.5 18.5 18.3 18,0 20.0 17.3 17.3 19.0 19.3 19.4 18.3 Condition of Bottom (wet or dry) Dry Dry, Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/^ N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 4 4 4 4 Rslnfomlng Bar Size (#) ,, 6 6 6 6 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 16.9 18.0 17.5 17.0 19.0 16.5 16.5 20.0 20.0 20.0 20.0 Time Drilling was Completed 11:15 a.m. 11:40 a.m. 11:55 a.m. 12:10 p.m. 1:35 p.m. 2:25 p.m. 2:45 p.m. 12:55 p.m. 1:00 p.m. 12:20 p.m. 12:35 p.m. Time Concrete was Placed 2:15 p,m. 3:35 p.m. 3:45 p.m. 4:05 p.m. 2:40 p.m. 4:10 p.m. 4:15 p.m. 2:20 p.m. 2:25 p.m. 2:30 p.m. 2:35 p.m. *Elevation was provided by others. REPORT OF DRILLED BELLED PIERS Project: Charles Schwab - Equipment Yard Report No.: 217 Wrangler, Coppen, Texas Date of Service: Project No.: 94001487 Technician: Driller: Page: 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 94001487.0017 02/19/01 M. Shields 2of3 Pier Identification 13 10 Pier Diameter (in.) 24 24 Bell Diameter (in.) 54 54 , *Top of Pier Elevation (ft) 98.0 98.0 Req. Depth from Exist. Grade (ft) 18.0 18.0 Initial Depth of Pier from Existing Grade (ft) 18.0 19.7 Final Depth of Pier from Existing Grade (fi) 18.0 19.7 Depth from Top of Concrete (ft) 17.2 19.7 Condition of Bottom (wet or dry) Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Casing, Diameter (in) N/A N/A Cased Depth (ft) N/A N/A Number of Vertical Bars (ea.! 6 6 Reinforcing Bar Size (#) 6 6 Length of Vertical Bars (ft.) 16.5 19.0 Time Drilling was Completed 3:05 p.m. 2:00 p.m. Time Concrete was Placed 4:20 p.m. 3:20 p.m. *Elevation was provided by others. REPORT OF DRILLED BELLED PIERS ENGINEERIIx~, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Project: Charles Schwab - Dumpster Area Report No.: 94001487.0017 217 Wrangler, Coppell, Texas Date of Service: 02/19/01 Project No.: 94001487 Technician: M. Shields Driller: Page: 3 of 3 Pier Identification 6 11 14 12 13 Pier Diameter (in.) 24 16 16 16 16 Bell Diameter (in.) 54 36 36 36 36 *Top of Pier Elevation, (ft) 94.0 94.0 94.0 94.0 94.0 Req. Depth from Exist. Grade (ft) 14.0 14.0 14.0 14.0 14.0 Initial Depth of Pier from Existing Grade {ft) 15.2 15.5 15.4 15.3 15.1 Final Depth of Pier from Existing Grade {ft) 15.5 15.5 15.4 15.3 15.1 Depth from Top of Concrete (ft) 14.5 14.0 14.0 13.5 13.5 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A Caeed Depth (ft) N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 4 4 4 4 ,R,elnforcing Bar Size (#) 6 6 6 6 6 Length of Vertical Bars (ft.) 13.5 20.0 20.0 20.0 20.0 Time Drilling was Completed, 3:35 p.m. 3:15 p.m. 3:25 p;m. 3:35 p.m. 3:45 p.m. Time Concrete was Placed 5:00 p.m. 4:35 p.m. 4:45 p.m. 5:10 p.m. 4:50 p.m. *Elevation was provided by others. CONCRETE COMPRESSIVE STp~NGTH TEST Client: Constructors & Associates Attn: Mike Donnelly 3333 Welbom St Suite 200 Dallas TX 75219 Report Date: Project: Service Date: Project Number: Report Number: EN(iIINt~.RIN~:. INC. 8901 Caqx~nter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 February 28, 2001 Charles Schwab 217 Wrangler Coppell, Texas February 19, 2001 94001487 94001487.0018 Material Information Specified Strength: 3000 psi @ 28 Days Batch Time: 3:20pm Supplier: TXI Plant: 31 Truck No: 817 Ticket No: 2827572 Mix I.D. No.: 46 Sample Information Sample Time: 4:20pm Technician: Mike Shields Weather Conditions: Cloudy, cool, windy Accumulative Yards: 30 Placement Method: Direct discharge Sample Locations: Pier #13 Equipment yard pier Placement Location: Piers Field Test Data Test Result Specification Test Method Slump, inches: 4.75 5-7 ASTM C-143 Air Content, %: N/A ASTM C-172 Concrete Temperature, o F: 68 ASTM C-39 Ambient Temperature, o F: 60 Plastic Unit Weight, pcf: Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Date Test Load Strength No. ID (inches) Tested (days) (lbs) (psi) 1 1 6.00 02/26/2001 7 107,080 3,790 I 2 6.00 02/26/2001 7 99,940 3,530 Average 3,660 I 3 03/19/2001 28 1 4 03/19/2001 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Mike Shields Report Distribution: ~E~B n ' ' (1) Constructors & Associates (1) City of Coppetl - Constr. Insp. Reviewed by (1) city of coppell- Bldg. Insp. Eric J. Cleveland, P.E. Senior Project Engineer The t_~__~ were performed in general ac(x~dance with applicable ASTM test methods. This repo~l is exclusively for the use of the client indicated above and shall no~ be reproduced except in full without the written approval of Ten-acon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of o~her apparently similar or identical materials. Page 1 of 1 o~-~w~o~-~,o Kw CONCRETE COMPRESSIVE STII;Ir~GTH TEST Client: Constructors & Associates Attn: Mike Donnelly 3333 Welborn St Suite 200 Dallas TX 75219 Report Date: Project: Service Date: Project Number: Report Number: 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 February 28, 2001 Charles Schwab 217 Wrangler Coppell, Texas February 12, 2001 94001487 94001487.0012 Material Information Specified Strength: 3000 psi @ 28 Days Batch Time: 1:12pm Supplier: TXI Plant: 31 Truck No: 35 Ticket No: 2825814 Mix I.D. No.: 46 Sample Information Sample Time: 2:08pm Technician: Gerry Graham Weather Conditions: Mild, cloudy Accumulative Yards: 10 Placement Method: Direct discharge Sample Locations: 4, 6, 15 and 25 Placement Location: Piers Field Test Data Test Result Specification Test Method Slump, inches: 5.25 5-7 ASTM C-143 Air Content, %: N/A ASTM C-172 Concrete Temperature, o F: 65 ASTM C-39 Ambient Temperature, 0 F: 45 Plastic Unit Weight, pcf: Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Date Test Load Strength No. ID (inches) Tested (days) (lbs) (psi) I 1 6.00 02/19/2001 7 83,220 2,940 I 2 6.00 02/19/2001 7 79,810 2,820 Average 2,881) 1 3 03/12/2001 28 1 4 03/12/2001 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Gerry Graham y~~~~~_nc. Report Distribution: (1) Constructors & Associates (1) City of Coppeil - Constr. Insp. Reviewed b ' (1) city of coppell - Bldg. Insp. Eric J. Cleveiartd,..P.E. Senior Project Engineer The tests were_performed in general accordance with applicable ASTM test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced excep{ in full without the written approval of Terracon. Test results transmitted herein are o~ly applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of olher apparently similar or identical materials. Page I of 1