Loading...
Coppell BC3-LR010227REPORT OF DRILLED BELLE~IER INSPECTION Client: Constructors & Associates Attn: Mike Donnelly 3333 Welborn St Suite 200 Dallas TX 75219 Report Date: Project: Service Date: Project Number: Report Number: 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 February 27, 2001 Charles Schwab 217 Wrangler Coppell, Texas February 20, 2001 94001487 94001487.0019 Services:Drilled belled pierinspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier inspection. See attached sheet for recorded data. NOTE: The contractor vibrated the top 6 feet of the piers when placing concrete. Technician: Mike Shields Report Distribution: (1) Constructors & Associates (1) City of Coppell - Constr. Insp. (1) City of Coppell - Bldg. Insp. Reviewed Eric J. Cleveland, P.E. Senior Project Engineer The tests were performed in general accordance with applicable ASTM test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written aPProval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of I ,~.*O~,~,K. REPORT OF DRILLED BELLED PIERS 8001 C.~r~nter F~wy., Suite #100 Dallas, Texas 75247 Project:Charles Schwab - Dumpster Area Report No.: 94001487.0019 217 Wrangler, Coppell, Texas Date of Service: 02/20/01 Prolect No.: 94001487 Technician: M. Shields Driller: Page: 1 of 1 Pier Identification 8 10 9 5 3 4 7 Pier Diameter (in.) 24 24 24 24 24 24 24 _ Bell Diameter (in.) 54 54 54 54 54 54 54 *Top of Pier Elevation (ft) 94.0 94.0 94.0 94.0 94.0 94.0 94.0 Req. Depth from Exist. Grade (ft) 14.0 14.0 14.0 14.0 14.0 14.0 14.0 Initial Depth of Pier from Existing Grade {ft) 14.0 14.0 14.0 14.3 14.0 15.0 14.1 Final Depth of Pier from Existing Grade (ft) 14.0 14.0 14.0 14.3 14.0 15.0 14.1 Depth from Top of Concrete (ft) 12.0 12.0 12.0 12.3 12.0 13.0 12.1 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes ' Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 11.5 11.5 11.5 11.5 11.5 12.5 11.5 Time Drilling was Completed 9:40a.m. 10:15a.m. 10:30a.m. 10:45a.m. 11:25a.m. 11:35a.m. 11:55a.m. Time Concrete was Placed 1:00 p.m. 3:20 p.m. 2:30 p.m. 2:55 p.m. 2:35 p.m. 2:45 p.m. 3:10 p.m. *Elevation was provided by others.