Coppell BC3-LR010226REPORT OF DRILLED PIER IN~,~.CTION
ENGZN~ IN~.
800'10arpenter Frwy., Suite #100
Dallas, Texas 75247
(214) 630d0'10
Client:
Constructors & Associates
Attn: Mike Donnelly
3333 Welborn St Suite 200
Dallas TX 75219
Report Date:
Project:
Service Date:
Project Number:
Report Number:
February 26, 2001
Charles Schwab
217 Wrangler
Coppell, Texas
February 13, 2001
94001487
94001487.0013
Services: Drilled pier inspection.
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier
inspection. Due to current weather conditions, the drilling of piers was reschedule for a later date. HBC's technician
picked up the concrete test cylinders made on the previous day and delivered them to HBC's laboratory for curing and
testing.
Technician: Gerry Graham
Report Distribution:
(1) Constructors & Associates
(1) City of Coppell - Constr. Insp.
(1) City of Coppell - Bldg. Insp,
Reviewed
by~ p.__~.
Senior Project Engineer_
The tests were performed in general accordance with applicable ASTM test methods. This report is exclusively for the use of the client indicated above
and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual
samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.