Loading...
Coppell BC3-LR010226REPORT OF DRILLED PIER IN~,~.CTION ENGZN~ IN~. 800'10arpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630d0'10 Client: Constructors & Associates Attn: Mike Donnelly 3333 Welborn St Suite 200 Dallas TX 75219 Report Date: Project: Service Date: Project Number: Report Number: February 26, 2001 Charles Schwab 217 Wrangler Coppell, Texas February 13, 2001 94001487 94001487.0013 Services: Drilled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier inspection. Due to current weather conditions, the drilling of piers was reschedule for a later date. HBC's technician picked up the concrete test cylinders made on the previous day and delivered them to HBC's laboratory for curing and testing. Technician: Gerry Graham Report Distribution: (1) Constructors & Associates (1) City of Coppell - Constr. Insp. (1) City of Coppell - Bldg. Insp, Reviewed by~ p.__~. Senior Project Engineer_ The tests were performed in general accordance with applicable ASTM test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of I ,,-sm~.~,.~