Loading...
Coppell BC3-LR010222.' REPORT OF DRILLED BELLE~I~ ER INSPECTION Client: Constructors & Associates Attn: Mike Donnelly 3333 Welborn St Suite 200 Dallas TX 75219 Report Date: Project: Service Date: Project Number: Report Number: 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 February 22, 2001 Charles Schwab 217 Wrangler Coppell, Texas February 12, 2001 94001487 94001487.0011 Services:Drilled belled pierinspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier inspection. See attached sheets for recorded data. Technician: Gerry Graham Report Distribution: (1) Constructors & Associates (1) City of Coppell - Constr. Insp. (1) City of Coppell - Bldg. Insp. Reviewed by: Eric J. Cleveland, P.E. Senior Project Engineer The tests were performed in general accordance with applicable ASTM test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page I of I REPORT OF DRILLED BELLED PIERS 8901 Carpenter Fmry., Suite #100 Dallas, Texas 75247 Project: Charles Schwab Report No.: 94001487.0011 217 Wrangler, Coppell, Texas Date of Service: 02/12/01 Project No.:94001487 Technician: G. Graham Driller: Page: I of 2 Pier Identification 04 06 15 16 07 08 17 II Pier Diameter (in.) 24 24 24 24 24 24 24 Bell Diameter (in.) 54 54 48 48 54 54 48 *Top of Pier Elevation (ft) 98.0 98.0 98.0 98.0 98.0 98.0 98.0 Req. Depth from Exist. Grade {ft) 18.O 17.9 19.0 18.4 18.8 18.5 18.6 Initial Depth of Pier from Existing Grade (ft) 18.0 18.0 18.0 18.0 18.0 18.0 18.0 Final Depth of Pier from Existing Grade {ft) 18.5 18.2 19.2 18.7 19.0 18.7 18.9 Depth from Top of Concrete (ft) 17.7 17.5 18.0 17.7 17.9 17.6 17.7 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes ,Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 17.3 17.1 17.6 17.3 17.5 17.2 17.3 Time Drilling was Completed 10:45 a.m. 11:45 a.m. 12:04 p.m. 1:34 p.m. 1:43 p.m. 2:00 p.m. 2:21 p.m. Time Concrete was Placed 2:12 p.m. 2:18 p.m. 2:30 p.m. 3:00 p.m. 3:40 p.m. 3:40 p.m. 3:54 p,m. *Elevation was provided by others. REPORT OF DRILLED BELLED PIERS Project: Charles Schwab Report No.: 217 Wrangler, Coppell, Texas Date of Service: Project No.: 94001487 Technician: Driller: Page: ENGINEERING, INC. 8901 Carpenter F~vy., Suite #100 Dallas, Texas 75247 94001487.0011 02/12/01 G. Graham 2 of 2 II Pier Identification 32 31 29 30 28 27 25 24 Pier Diameter (in.) 16 16 16 16 16 16 16 16 Bell Diameter (in.) 36 36 36 36 36 36 36 36 *Top of Pier Elevation (ft) 98.0 98.0 98.0 98.0 98.0 98.0 98.0 98.0 Req. Depth from Exist. Grade (ft) 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 Initial Depth of Pier from Existing Grade (ft) 20.0 18.0 18.9 17.8 19.0 19.1 18.2 18.5 Final Depth of Pier from Existing Grade (ft) 20.0 18.2 18.9 18.1 19.0 19.1 18.2 18.7 Depth from Top of Concrete (ft) 18.5 16.7 17.4 16.6 17.5 17.6 17.5 18.0 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Cgsing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 4 4 4 4 4 4 4 4 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 Time Drilling was Completed 12:20 p.m, 1:05 p.m. 1:15 p.m. 1:25 p.m. 1:50 p.m. 1:35 p.m. 2:05 p.m. 2:15 p.m. Time Concrete was Placed 4:20 p.m. 4:10 p.m. 3:50 p.m. 3:40 p.m. 3:15 p.m. 3:25 p.m. 3:05 p.m. 2:50 p.m. *Elevation was provided by others. REPORT OF DRILLED PIER I~"'~ECTION Client: Constructors & Associates Attn: Mike Donnelly 3333 Welborn St Suite 200 Dallas TX 75219 Report Date: Project: Service Date: Project Number: Report Number: 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 February 22, 2001 Charles Schwab 217 Wrangler Coppell, Texas February 14, 2001 94001487 94001487.0015 Services:Drilled pierinspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier inspection. Upon arriving at the jobsite, HBC's technician was notified that pier drilling for this date was cancelled and would be rescheduled. Technician: Gerry Graham Report Distribution: (1) Constructors & Associates (1) City of Coppell - Constr. Insp. (1) City of Coppell - Bldg. I_nsp. Reviewed by~ Eric J. Cleveland, P.E. Senior Project Engineer The tests were performed in general accordance with applicable ASTM test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1