Loading...
WA9301-CS 980609 (2) MEETING MINUTES COPPELL 2 METERING STATION CONSTRUCTION PROGRESS MEETING NO. 10 June 9, 1998 Attendees Bar Constructors: Acme Electrical: City of Coppert: DWU Water Facilities: DWU Design Services: DWU Pumping: Sam Arrambide Randy Hodges Glenn Hollowell, Larry Davis, Ted Dutt Jennifer CoRingham, John Mathis Hank Niblo, Richard Wagner Bradley Keahey Please bring these minutes to our next progress meeting! SCHEDULE Reviewed Bar Constructors' schedule - see attachment. Sam Arrambide expects to complete this project by July 2, 1998. Bar Constructors expects to finish back-filling the Pressure Reducing Vault site and have Sandy Lake Road back in service by Thursday this week. Acme Electrical expects to have power to the meter vault and the telephone board installed by end of next week. Will schedule phone service installation the week following. Action: Bar Constructors, In~, DWU. No issues concerning RFIs at this time. Action: None Required SUBMITTALS The final submittal for the venturi meter has not been received. Acme Electrical will check on status. Mathis veri~fing the deliverables related to the Vault Termination Unit and will forward to DWU Pumping Division as soon as all parts are received. Action: John Mathis, Bar Constructors, In~ 4. SHUT DOWN The shut down to tie in of the new 42 inch pipeline to the existing 36 inch supply line occurred without incident. Coppell stated how pleased they were with the continual monitoring from Pu.mping Division. Thank you to everyone for the level of cooperation and a job well done Action: Resolved. 5. SAFETY No issues at this time. Action: None required. NEXT MEETING: TUESDAY - 10 am - JUNE 16 C: Charlie Stringer, Ken Griffin, Robert Barron, Ron Brookins, Paul Henning, John Wilson, Steve Hardy, Phil Boyd, Tonia Lichtenberg, Dennis Cave, Attendees, File 94-81 MEETING MINUTES - COPPELL 2 METERING STATION - PAGE 2 BAR CONSTRUCTORS. INC. Act Description ID 1000 ~ Mobilizatio~ 10~0 Locate Ex Utilities 1020 Relocate 2' PVC Lines 1030 Instell Bypass & Valves 1050 Exc Meter Vault 1060 Meter Vault Slab 1070 Meter Vault Walls 1080 Meter Vault Deck .: 5 1090 New12" & 24' Pipe & :10 lp~'' Remove Bypass 1 ~, BF Meter Vault 1110 MeterVaultElec& !17 1120 Meter Vault Mechanical ; 10 1130 Paint Meter Vault Pipe ~5 1140 ConeDrive&Pay ~5 1150 Repair Conc Channel i6 1160 Chain Link Fence i 3 1170 42"TV ~2 1180 42",24",16" Pipe & Vk, s 20 1190 PRV Vault Slab 1200 Set Procast Vaults ~ 3 1210 BF Precast Vault 1220 PRV Vault Vents/Ladders 123n Paint PRV Vault Pipe 12 ~,. Final Grading/Seeding =4 14 !4 15 :2 ~5 COPPELL 2 METERING STATION lm JUN ; JUL II ~18. ~ZZ 21 pi ~3 ;29 13MAYg8 k22JUNge 13~YgSA:O2JUt,98 13MAY98k03JUNg~A ~iRY96 k01. I~ult Deck 1090:.New 12"&24'Pipe &V'NS I___~, 15JUNge':19JUNg6109 ~ ~ 1:Remove Bypese ~1100:.BFMe~rVaul -, -, ,, ~ -- -~ ~ - -~ -~ -, -~ -, -, ~1110:MeN'VeultElec&lnltn 1130:.Paint Meter Vault Pipe )8jU~'22JUNge 1140:Conc Drve & Ply ~1180:42",24".16*Pipe&VIvs LINg6 A 1210:BF PrecaM Vaull I h, -,. lC~ bar