Coppell BC3-LR000913 GEOTECHNICAL anD I E~ F~I r-i ii p
~NVIEONMENTAL CONSUlTaNTS I
September 13, 2000
Project No. 6686~
Report No. 54
Lincoln Property Company
3300 Lincoln Plaza
500 N. Akard Street
Dallas, Texas 75201
ATTN: Mr. Brett Phillips
Re:
Structural Steel Inspection
Coppell III
Crestside Drive and Wrangler Drive
Coppell, Texas
Gentlemen:
Transmitted here are the results of the structural steel inspection performed at the referenced
site for Reed Engineering Group, Inc. on August 29, 2000, by Contract Inspection Service.
Should you have any questions, please do not hesitate to call.
Sincerely,
REED ENGINEERING GROUP, INC.
F. Phipps,
/FP/cg
copies submitted:
(1) Lincoln Property Company/Mr. Brett Phillips
(1) Lincoln Property Company/Mr. Kyle Bramlett
(1) O'Brien & Associates/Mr. Mick Granlund
(1) Butler Construction Company/Mr. Chris Butler
(1) City of Coppell/Mr. Lee Stone
(1) City of Coppell/Mr. Larry Davis
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · ti[ [214] 350 5600 · fax [214] 350 0019