Loading...
Coppell BC3-LR000829CONTRA CT INSPECTION SER VICE, Inc. 4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-5989 REPORT OF METAL ROOF DECK INSPECTION Report No: 18708-0 Attention: Keith Atkins Date of Service: 08-29-00 Project: Coppell Business Center III Coppell~ Texas Client: Reed Engineering Group 2424 Stutz, Suite 400 Dallas, TX 75235 Pa~e 1 of P~'POR T OF INSPECTION Drawings utilized: Contract Documents Locations/item inspected: Grid line E to I, column line 1 to 9 Discrepancies/comments: Metal roof deck: 1.) Puddle welds comply. 2.) Side lap screws comply. Technician ct Inspection Service This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client GEOTECHNICAL AND J r~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Coppell III Crestside Drive and Wrangler Drive Coppell, Texas REPORTED TO: CONTRACTOR: Lincoln Property Company 3300 Lincoln Plaza 500 N. Akard Street Dallas, Texas 75201 ATTN; Mr. Brett Phillips Butler Construction Company REPORT NO. 53 REG PROJECT NO. 6686 SAMPLE DATE: 08-29-00 TECHNICIAN: C. McEntee Location of Sample ISet Number I Location 1 Slab leaveout: E.8-1.2 J Quantity Represented 20/100 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Pioneer 9349 4000 Test Results Set Cylinder I No. ID 1 9122 9122 9122 J Age @ J Total Load J Compressive Average Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 09-05-00 7 09-26-00 28 09-26-00 28 99430 3520 Cylinder Data Set1 Cylinder I ~,m.o' I I Con=ret· Air I No. ID Slump Sample Air Temp. Temp. Entrainment Number 9122 6.0 8:40AM 88 95 N/A 668777 Distribution: (1) Lincoln Property Company/ Mr. Brett Phillips ~(1),'Lincoln Property Company/ A/Ir. Kyle Bramlett (1),O'Brien & Associates/ A4r. Mick Granlund (1)'Butler Construction Company/ Mr. Chris Butler (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Set CylinderI No. ID 5 7593 7593 7593 7593 6 7594 7594 7594 7594 Age @ Date Tested Test 07-21-00 7 08-11-00 28 08-11-00 28 Hold H Total Load lbs. 94700 126780 114410 07-21-00 7 08-11-00 28 08-11-00 28 Hold H 93850 121700 123070 Compressive J Average Strength p.s.i. Strength p.s.i. 335O 4480 4050 427O 3320 4300 4350 4330 Cylinder Data Set Cylinder No. ID 1 7589 2 7590 3 7591 4 7592 5 7593 6 7594 Time of Slump Sample 4.75 4:45AM 5.00 6:45AM 5.00 8:50AM 5.00 11:19AM 5.75 1:48PM 5.50 2:45PM J AirTemp. J 82 84 84 90 95 100 ConcreteI Air J Ticket Temp. Entrainment Number 89 NA 617869 90 NA 612151 91 NA 649989 93 NA 650020 94 NA 650048 97 NA NA Distribution: (1) Lincoln Property Company/ Mr. Brett Phillips (1) Lincoln Property Company/ Mr. Kyle Bramlett (1) O'Brien & Associates/ Mr. Mick Granlund (1) Butler Construction Company/ Mr. Chris Butler (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KENrt/je