Loading...
Coppell BC3-LR000809 GEOTECHNICAL AND ENVlp`ONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Coppell III Crestside Drive and Wrangler Drive Coppell, Texas REPORTED TO: Lincoln Property Company 3300 Lincoln Plaza 500 N. Akard Street Dallas, Texas 75201 ATTN: Mr. Brett Phillips CONTRACTOR: Butler Construction Company Location of Sample Set Number I Location 1 Paving: 110'N, 105'E of S.E. building corner 2 Paving: 115'N, 120'E of S.E. building corner 3 Paving: 90'N, 135'E of S.E. building corner REPORT NO. 44 REG PROJECT NO. 6686 SAMPLE DATE: 08-09-00 TECHNICIAN: F. Steadman J Quantity Represented 90/340 210/340 310/340 Design Information J Source of Concrete J Mix Identification Pioneer 7306 Specified Strength p.s.i. 3000 Test Results Set Cylinder J No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 2 8483 08-16-00 7 8483 09-06-00 28 8483 09-06-00 28 8483 Hold H 3 8484 08-16-00 7 8484 09-06-00 28 8484 09-06-00 28 8484 Hold H 8485 08-16-00 7 8485 09-06-00 28 8485 09-06-00 28 8485 Hold H 92510 3270 9261O 328O 87090 3080 2424 STUTZ DP,. * SUITE 400 · DALLAS, TX 75235 * TEL [214] 350 5600 * FAX [214] 350 0019 Cylinder Data Set Cylinder ID 8483 8484 8485 Time of Slump Sample 5.50 5:45AM 5.75 7:15AM 5.75 8:20AM lAir Temp. 79 79 81 I Concrete Air Ticket Temp. Entrainment Number 91 3.7 651633 9O 3.9 651646 89 3.4 651658 Distribution: (1) Lincoln Property Company/ Mr. Brett Phillips (1) Lincoln Property Company/ Mr. Kyle Bramlett (1) O'Brien & Associates/ Mr. Mick Granlund (1) Butler Construction Company/ Mr. Chris Butler (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KENje/rt GEOTECHNICALAND ~ ~ ~ I I ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Coppell III Crestside Drive and Wrangler Drive Coppell, Texas REPORTED TO: Lincoln Property Company 3300 Lincoln Plaza 500 N. Akard Street Dallas, Texas 75201 ATTN: Mr. Brett Phillips CONTRACTOR: Butler Construction Company Location of Sample Set Number I Location REPORT NO. 44 REG PROJECT NO. 6686 SAMPLE DATE: 08-09-00 TECHNICIAN: F. Steadman Quantity Represented 1 Paving: 110'N, 105'E of S.E. building corner 90/340 2 Paving: 115'N, 120'E of S.E. building corner 210/340 3 Paving: 90'N, 135'E of S.E. building corner 310/340 Design Information Is°urce °f c°ncrete IPioneer Mix IdentificatiOn 7306 I Specified Strength P's'i' I 3000 Test Results Set Cylinder No. ID I Age@ Total Load I CompressiveI Average Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 8483 08-16-00 7 92510 3270 8483 09-06-00 28 113610 4020 8483 09-06-00 28 124840 4420 8483 Hold H 8484 08-16-00 7 92610 3280 8484 09-06-00 28 109900 3890 8484 09-06-00 28 113000 4000 8484 Hold H 8485 08-16-00 7 87090 3080 8485 09-06-00 28 103860 3680 8485 09-06-00 28 108670 3850 8485 Hold H 4220 3950 3770 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 350 0019 Cylinder Data Set Cylinder No. I ID i 8483 8484 8485 Time of Slump Sample Air Temp. 5.50 5:45AM 5.75 7:15AM 5.75 8:20AM 79 79 81 Concrete I Air Ticket Temp.I Entrainment Number 91 3.7 651633 90 3.9 651646 89 3.4 651658 Distribution: (1) Lincoln Property Company/ Mr. Brett Phillips (1) Lincoln Property Company/ Mr. Kyle Bramlett (1) O'Brien & Associates/ Mr. Mick Granlund (1) Butler Construction Company/ Mr. Chris Butler (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KENje/rt