WA9301-CS 980519 MEETING MINUTES COPPELL 2 METERING STATION CONSTRUCTION PROGRESS MEETING NO. 7 May 19, 1998 Attendees Bar Constructors: City of Coppell: DWU Water Facilities: DWU Pipeline Facilities: DWU Pumping: Joe Arrambide Larry Davis Jennifer Cottingham, John Mathis, Robert Barron, Ron Brookins Hank Niblo (DWU Design) Dennis Cave Please bring these minutes to our next profess meetingl SCHEDULE Bar Constructors, Inc. did not provide an updated schedule this week. Bar Constructors is behind schedule by approximately one month and one week. Action: Bar Constructors, Inc~ Need to locate RFI No. 9 regarding stair rebar to complete the signature process. Action: DWU SUBMITTALS Hank inquired about the final submittal for the venturi meter - must be approved before installation of the meter. Bar Constructors to submit deliverables related to the Vault Termination Unit "VTU" to DWU as soon as possible to the job site. Inspection to prepare detailed inventory on speed memo and deliver to Ron Deloach. Action: Bar Constructors, In~ and DWU SHUT DOWN One more shut down to complete this project is required to make the tie in of the new 42 inch pipeline to the existing 36 inch supply line. Contractor requested a delay for the shut down. Memorial Day Holiday interferes with scheduling the shut down. Coppell begins water rationing on May 15, 1998. No lawn watering allowed on Wednesdays, so the required shut down will begin on the first available Wednesday, May 27. Bar Constructors estimates that the work on this tie in will begin on or around 9 am Wednesday, May 27, 1998 after the morning load is over for Coppell. Preparation for this shut down will be coordinated just as on previous shut downs. Coordination includes passing the hydrostatic testing of the new forty two inch supply line, chlorination and maintaining water supply to Coppell, Should an alternate date be required, City of Coppell to inform DWU of their preference date. Action: Bar Constructors, the, DWTJ and Coppell 5. SAFETY Bar Constructors made necessary road repairs. Action: Resolved 6. IRRIGATION AT VILLAGE PARKWAY PUMP STATION Bar Constructors capped off the sprinkler system around the new meter vault. Action: Resolved 7. RESPONSE TO SPEED MEMOS Received responses to the speed memos issued on April 16 and 22, 1998. Action: Resolved Handrails that were delivered to the job site were rejected. Bar Constructors scheduled pick up by the manufacturer today. Action: Bar Constructors, Inc NEXT MEETING: TUESDAY - 10 am - MAY 26 c: Charlie Stringer, Ken Griffin, John Wilson, Phil Boyd, Steve Hardy, Attendees, File 94-81 MEETING MINUTES - COPPELL 2 METERING STATION - PAGE 2 t 'r '! r