Loading...
Coppell BC3-CS000912September 12, 2000 Kyle Bramlett Lincoln Property Co. 3300 Lincoln Plaza 500 N. Akard Dallas, Texas 75201-3394 Final Walk-thru Dear Mr. Bramlett: Please be advised that a walk-through has been scheduled for Thursday, September 14, 2000 at 9:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972-304-7090 at your earliest convenience. Sincerely, Lanny Allison Construction Inspector CC; Chris Butler, Butler Construction (fax 817-267-1902) James Corer, TriDal (fax 817481-8195) Mike Martin, Assistant City Engineer Debi Ingrain, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal PARKWAY ~ P.O.BOX 476 iff COPP£LL TX 7~OI9 1~ TEL 9721462 0022 'Jr FAX 972/304 3673