Coppell BC3-CS000912September 12, 2000
Kyle Bramlett
Lincoln Property Co.
3300 Lincoln Plaza
500 N. Akard
Dallas, Texas 75201-3394
Final Walk-thru
Dear Mr. Bramlett:
Please be advised that a walk-through has been scheduled for Thursday, September 14, 2000 at
9:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please
call 972-304-7090 at your earliest convenience.
Sincerely,
Lanny Allison
Construction Inspector
CC;
Chris Butler, Butler Construction (fax 817-267-1902)
James Corer, TriDal (fax 817481-8195)
Mike Martin, Assistant City Engineer
Debi Ingrain, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
PARKWAY ~ P.O.BOX 476 iff COPP£LL TX 7~OI9 1~ TEL 9721462 0022 'Jr FAX 972/304 3673