Loading...
2013_0402Date: 12-o t 1- T K C• C t T Y 6 F COFFELL � e E b � b,fE TIER ISSUANCE / WORK ORDER Company/Rcpimseatative: -TAG/ F" Account Nuaber-. \/Ib A�zQA Praje -t Name: l.._0 C_ A, C_ ► t`t Ti— 2 Location of Meter: �j —] r-7 1� 1 T 1) ` i � 9- TZ M;, or A rrnnnt lv ame: 1 r,,- t v k K R_ C () �—i.S Billing Address: C>rZ, 3�� Z City: I 0�''J-'" d' D.L. C;)o _Z Signature: Stater � Zip Code: �v L Phone r: (q'-1 Z l Z Z (- 5 55 v Printed Name: ��� V � '� 2 Domestic Mir. 'u Domestic Mtr, 4 Irrigation Mtr. # Irrigation Mtn 9 Fire Line Mtr. Fire Line Mtr. 9 Temporary Mtr. # tl Size: Reading Size: Reading Size: Reading Ste: Reading Size: Ring Size: Reading ROOM. - .. Deposit Amt Deposit Amt Deposit Amt Deposit Amt Deposit Amt Beginning Reading Deposit Amt. TEMPORARY METERS: Sl 0DO DEPOSIT REQUIRED Applicant shall return the meter to 816 S. Coppell Road hen completed with project Cost of any repairs or replacements necessary shall be billed on the final statement or deducted from the deposit. Applicant is responsible for winterizing all temporary construction meters and components to protect them against any damage due to freezing temperatures. Customer is not allowed to move.or relocate a meter to different jat7s /projects. Only yellow City Fire hydrants may be used. Customer must call 972 -462 -5150 to report a reading. The City is not responsible for any stolen property under any conditions. The City will deposit the $1,000 upon receipt The current, minimum monthly water bill shall be $48.40, which includes the first 1;000 gallons used. All water in excess of 1,000 gallons will be $2.60 per 1;000 gallons. (Minimum charges are subject to change.) Monthly payment is due by the 5'� of each month. If payment is not received by this date, there will be a penalty of 10% accessed to the total balance. Water Tap $ Sewer Tap Meter $ Final Inspection $