2012_0620Date: w - /a)- i -
Project Name:
T K C C I T Y 0 F
COFFELL
r o
A a t 4
IvTER ISSUANCE / WORK ORDER
Company/Representative:
Location of Meter. 6(,t i I 6 6 ` aA
Billing Account Name:
Billing Address: 50q C,. RiM ak0 i City: Q100 X0
Account Number:
State: Zip Code:
Phone #: D.L. #:
Printed Name:
Domestic Mtr. 4 7 Size: Reading Deposit Amt
Domestic Mtr. 4 Size: Reading Deposit Amt
Irrigation Mtr. 4 Size: Reading Deposit Amt
Irrigation Mtr. 4 Size: Reading Deposit Amt
Fire Line Mtr. 4 Size: Reading Deposit Amt
Fire Line Mtr. 9 Size: Reading Deposit Amt
Temporary Mtr. 4 B `inning Reading Deposit Amt
TEMPORARY METERS: $1.000 DEPOSIT REQUIRED
Applicant shall return the meter to 816 S. CoppDU Road when completed with project Cost of any repairs or
replacements necessary shall be billed on the final statement or deducted from the deposit-
Applicant is responsible for winterizing all temporary construction meters and components to protect them against any
damage due to freezing temperatures.
Customer is not allowed to move or relocate a meter to different jobs/projects. Only yellow City Fire Hydrants may be
used. Customer must call 972 - 462 -5150 to report a reading. The City is not responsible for any stolen property under
any conditions.
The City will deposit the $1,000 upon receipt The current, minimum monthly water bill shall be $48.40, which
includes the first 1,000 gallons used- All wafer in excess of 1,000 gallons will be $2.60 per 1,000 gallons. (Minimum
charges are subject to change.) Monthly payment is due by the 50' of each month. If payment is not received by this
date, there will be a penalty of 10% accessed to the total balance.
Water Tap $ Sewer Tap $ Meter $ Final Inspection $