Loading...
2012_0416T K C C I TF COF ELL T � E ° ?.IETF-R ISSUANCE / WORK ORDER Account Number•. Date: �' _ (� Company/Representative: Project Name: � D f4 j4,-,j V-- C, ,4 T (o tAJ Location of meter. O 1 C Fo Billing Account Name: Billing Address: Z 0 5 4— Y t-2- '� � City: C`,o n e- t/ Stater dip Cade: �. S o l Phone #: (Z ► `-(1 04 x �' - sz O� D.L. Printed Name: �k 4 y e7 S Signature: -' - Domestic Mtr. # Domestic Mtr. # irrigation Mtr. # - 1 �)2- 32 -` (,)�i Irrigation Mtr. # Fire Line Mtr. # Fire Line Mtr. # Temporary Mtr. ## Size: Reading Size: Reading t� Size: 2 Reading f Size: Reading Size: Reading Size: Reading Beginning Reading Deposit Amt Deposit Amt. Deposit Amt Deposit Amt Deposit Amt Deposit Amt Deposit Amt TEMPORARY METERS' $1 000 DEPOSIT REQUIRED Applicant shall return the meter to 916 S. Coppell Road when completed with project Cost of any repairs or replacements necessary shall be billed on the final statement or deducted from the deposit Applicant is responsible for wintervzing all temporary construction meters and components to protect them against any damage due to freezing temperatures. Customer is not allowed to move or relocate a meter to different jobs/projects. Only yellow City Fire Hydrants may be used. Customer must call 972 -462 -5150 to report a reading. The City is not responsible for any stolen property under any conditions. The City will deposit the $1,000 upon receipt The current, minimum monthly water bill shall be $48.40, which includes the first 1,000 gallons used. A11 water in excess of 1,000 gallons will be $2.60 per 1,000 gallons. (Minimum charges are subject to change.) Monthly payment is due by the 56 of each month. If payment is not received by this date, there will be a penalty of 10% accessed to the total balance. Water Tap $ 5D, Sewer Tap $ Meter $ 3 , Final Inspection $