Loading...
WA9301-CS 980429COPPELL, TEXAS 75019 RO. Box 478 Coppell, Texas 75019 972-462-0022 April 29, 1998 Phillip L. Boyd, Manager City of Dallas Wholesale Services Division Water Utilities Department 1500 Marilia Room 4 AN Dallas, Texas 75201 Re: Rate of Flow Controller (WA 93-01) Dear Mr. Boyd: This letter is written in response to your April 21, 1998 letter concerning our intentions for the existing metering station on Sandy Lake Road once the new meter vault is constructed at the Village Parkway Pump Station. The City currently has several water projects underway in addition to the new meter vault at Village Parkway. Those include some transmission lines and an additional elevated storage tank. It is the City' s intention to follow-up the completion of those projects in addition to the new meter vault at Village Parkway Pump Station with an additional contract to abandon the existing metering station on Sandy Lake Road. The actual timetable is unknown, but again it will follow the completion of the aforementioned projects. ff you should have any additional questions or need additional information please feel flee to contact me. Sincerely, y~~ Kenneth M. Griffin, P.E. Director of Engineering and Public Works co: Ted Dutt, Water Utilities Sr. Crewleader ~e/kgriffin/wa9301/d~ll~.498