WA9301-CS 980429COPPELL, TEXAS 75019
RO. Box 478
Coppell, Texas 75019
972-462-0022
April 29, 1998
Phillip L. Boyd, Manager
City of Dallas
Wholesale Services Division
Water Utilities Department
1500 Marilia Room 4 AN
Dallas, Texas 75201
Re: Rate of Flow Controller (WA 93-01)
Dear Mr. Boyd:
This letter is written in response to your April 21, 1998 letter concerning our intentions for the
existing metering station on Sandy Lake Road once the new meter vault is constructed at the
Village Parkway Pump Station. The City currently has several water projects underway in
addition to the new meter vault at Village Parkway. Those include some transmission lines and
an additional elevated storage tank. It is the City' s intention to follow-up the completion of those
projects in addition to the new meter vault at Village Parkway Pump Station with an additional
contract to abandon the existing metering station on Sandy Lake Road. The actual timetable is
unknown, but again it will follow the completion of the aforementioned projects.
ff you should have any additional questions or need additional information please feel flee to
contact me.
Sincerely, y~~
Kenneth M. Griffin, P.E.
Director of Engineering and Public Works
co: Ted Dutt, Water Utilities Sr. Crewleader
~e/kgriffin/wa9301/d~ll~.498