2006_1102GREENCO UTILITIES
OFFICE (972) 617 -8568
MOBILE (214) 564 -4319
Meter Work Order
P.O. BOX 1871
RED OAK, TX 75154
Job #
Customer: +z 6E Date: IL
2 a6
Location: P j- t:5(9 S
I10 � (�LIUC
Mfg: % Size:
Model: y1t Serial #:
Pressure: Overall %
Meter reading before test Meter reading after t st
Main Line ��'� GUO
Bypass �� b
FM
Please circle applicable response.
t/No Test Plug gpm %
o Isolation Valves _ ►= (� gpm %
e o By Pass _gpm %
Yes/No Within AWWA Specs gpm %
Work Performed
Start Time: -End Time: a.m. /p.m.
Field Supervisor
Comments
f&[3, *"7 '-/. s
[,