2006_1107GREENCO UTILITIES
OFFICE (972) 617 -8568
MOBILE (214) 564 -4319
Meter Work Order
P.O. BOX 1871
RED OAK, TX 75154
Job #
Customer: Date:
Location:
Mfg: Size: L'
Model: Serial #:
Pressure: Overall %
Meter reading before test Meter reading after t t
Main Line kj4n Dv v '710(1 'j
Bypass yon d
FM
Please circle applicable response.
t/No Test Plug � gpm %
/No Isolation Valves gpm C/ % %•, %
Y o By Pass 3 gpm i /' Z %
Yes/No Within AWWA Specs gpm %
Work Performed
Start Time: ./p End Time: a.m. /p.m.
Field Supervisor
Comments; 8 27 /7 0 G 2 �