2000_0509GREENCO UTILITIES
OFFICE (972) 617 -8568
MOBILE (214) 564 -4319
Customer:
Location:
Mfg:
Model:
Pressure:
P.O. BOX 1871
RED OAK, TX 75154
Meter Work Order
Job #
Date: -
d) her'fi_s oo s
�):Cykc.
r ) v2 Y x
Meter reading before test
Main Line
Bypass
FM
Please circle applicable response.
O� No Test Plug 3
r /No Isolation Valves _s O o By Pass 5-c:
o Within AWWA Specs
Work Performed
Start Time:
Field Supervisor
Comments
apel
Size:
Serial #:
Overall %
S)xy
Meter reading after test
gpm
gpm
gpm
gpm
End Time:
01 %
t�® %
y7 S %
a.m. /p.m.