Michael A. Martin, P.E., The City of Coppell Assistant City Engineer
Brian Gray
Office / Warehouse Square Footage Calculations
February 12, 2001
CharlesSchwab AMS II, Coppell Busines Center III, Northlake 635 Buisiness Park Lots 1&2
Mr. Martin,
We respectfully submit the following response to your letter dated January 29, 2001
concerning the above referenced project.
1. The square footage breakdown of Offices/Production vs. Dock/Warehouse is:
90,200 sqft. of Offices/Production
25,000 sqft. of Dock/Warehouse
2. Drawing notes on A1.02 indicate to refer to A1.03 for dimensional information on area of
concrete to be removed.
3. Drive approach in city Right-of-Way has been noted on drawing A1.03 to be lime
stabilized per City Standard Details.
4. The Ladscape drawings have been included for reference to indicate the proposed
grades at landscaped areas.
5. The proposed relocation of the fire hydrant and fire department connection on the south
side of the building has been shown to be at the fire department approved location.
6. The paving plans are signed by a civil engineer. The Fire hydrant relocation is noted to
be designed and engineered by the contractor.
A revised set of drawings is being submitted to reflect the city comments.
Regards,
Brian P. Gray
Associate