WA9301-CS 980420 MEETING MINUTES COPPELL 2 METERING STATION CONSTRUCTION PROGRESS MEETING NO. 3 April 20, 1998 Attendees Bar Constructors: City of Coppell: DWU Water Facilities: DWU Pipeline Facilities: DWU Design: DWU Wholesale Services: Sam Arrambide Ted Dutt Jennifer Cottinghaxn, John Mathis, Robert Barton Hank Niblo ( DWU Design) Steve Hardy Phil Boyd 1. SCHEDULE Bar Constructors, Inc. provided their updated schedule. As of this progress meeting, it appears that Bar Constructors is behind schedule by approximately one month. See attached copy. Action: Bar Constructors, In~ SUBMITTALS Bar Constructors, Inc. inquired about the status of the size of the flange for the turbine meter. Hank Niblo needs a response from PFS regarding the calibration used in the venturi meter test and to receive the final report of the venturi testing. Requested assistance from Bar Constructors in getting this information. · Action: Bar Constructors, In~, DWU Design RFIs No problems at this time Action: None Required BACKFILL MATERIAL Pipeline Design approved use of natural materials for backfill on the condition that existing pipeline thrust block enhanced with additional concrete. Action: Bar Construcwrs, In~ 5. SHUT DOWN Shut down for approximately one day of the Coppert 36 inch supply line to accomplish work of installing the new 42 inch supply iine around the first of two existing 45 ° bends in the 36 inch line is scheduled to begin at approximately 9 am Tuesday, April 21. Bar Constructors, Inc. needs more intermittent shut downs to complete the new 42 inch pipeline, pressure reducing vaults and tie in to the existing 36 inch supply line. The required shut downs of the thirty six inch line and durations are not know at this time. Coppell and Bar Constructors to locate and exercise the valve on the 24 inch supply line tomorrow morning so that work can begin on the second shut down on Thursday, April 23. In anticipation of using the old pump station and supply lines during the shut downs, Coppert is sending an electrician to work on pumps at the old pump station tomorrow momingo Action: Bar Constructors, Inc., DWU and Coppert 6. TELEPHONE COORDINATION Bar Constructors, Inc. indicated the date to tell ECI for GTE phone line installation into the new metering station is about May 13, 1998. Action: Project Manager, ECI and Bar Constructors, In~ 7. TRAILER CLEANING Contractor cleaned the trailer at last week and will continue to clean trailer on a weekly or as needed basis as determined by DWU Inspection. Contractor still needs to repair the toilet in the trailer. Acaon: Bar Construcwrs, Inc. NEXT MEETING: TUESDAY - 9 am - APRIL 28 CharHe Stringer, Ken G6.'ffirt, Dennis Cave, John Wilson, Tonia Lichtenburg, Richard Wagner, Attendees, File 94-81 MEETING MINUTES - COPPELL 2 METERING STATION - PAGE 2 ) .1010 Ly..el. EX Utllies ~,0~) ,.MeWV~I~ 2 10~ .M~ Vd W~ 5 11~ ,~V~ 4 ti70.4~W 2 11~ ~PRVV~ t~ ~VV~tV~ 4 ~' :~1G~k~ ~4 CO~ELL3MRTBliNGITA11ON