Loading...
2011_1219CHECK ONE: IRRIGATION DOMESTIC FIR E LIN E BACKFZOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT i t 11 NAME OF PWS: � _n�O�i! i � �Gl l � SG��v : ��- PWS I.D. # LOCATION OF SERVICE: � �� � W'(�Y`� IE' -�✓� �� �' The baci. -IIow prevention assembly detailed below has been tested and maintained as required by TNRCC reguiations and is ca�tif � to be operating within acccptablc paramctrrs_ TYPE OF ASSEIv1BLY � Reduced Pressure Principle o Pressure Vacuttm Breaker � /D��oublettC�heck Valve o Atmosphere Vacuum Breaker Manufacturer l/LJQi'i S Sizc � �Z Model Number �� -/ � Z � Located At =� eei r r q O � ft ��u Serial Number �I3 �� Z r The about is ce:'tificd to be true. Firm Name P s i -�s�- Certified Tester n U� 1 e Firm Address � �� �� Y� Ccrt Tester No. BPG��� Date ��' � �� Gauge # �_. --�� j �7 Date Iast accuracy tested `� � 3 � % Whfte — Customer's copy YeIIow -city copy Pink - Tester's copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACLTiJM BRFASC'F•R Double Check Valve Assembly 1st Check 2nd Checl: Relief Valve Air Inlet Cheek Valve Initial Test DC- Closed Closed Tight O Opened at Opmcd at osid Q Tilt � R.P- osid Lcakcd o 3.f psid osid Leaked o Did not Opm o Leaked o �P� and Materials Used Teri Ai3er DC- Closed Closed Tight o Opined at Opined at n_ sid Repair Tight � nsid osid RP sid The about is ce:'tificd to be true. Firm Name P s i -�s�- Certified Tester n U� 1 e Firm Address � �� �� Y� Ccrt Tester No. BPG��� Date ��' � �� Gauge # �_. --�� j �7 Date Iast accuracy tested `� � 3 � % Whfte — Customer's copy YeIIow -city copy Pink - Tester's copy