Loading...
2011_0406 (4)CIiECK ONE: IRRIGATION i7O IM ESTIC FIRELINE BACKFT.OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # LOCATION OF SERVICE: = � The backtlow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY � Reduc. -d Pressure Principle a Pressure Vacuum Breaker � Double Check Valve c Atmosphere Vacuum Breaker Manufacnu er Model Number Serial Number Size Located At The above is certified to be true. Firm Name Firm Address Gauge # llate last accuracy tested Certified Tester Cent Teste No. Date White - Customer`s Copy Yellow -City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BRF AT.'FR Double Check Valve Assembly 1st Chec4: Znd Checl: Relief V aloe Air Inlet Check Valve Initial Test DC- Closed Closed Tight D Opened at Opened at nsid Tight o Leaked O psid nsid RP- psd Leaked C Did not Open o Leaked o Rep airs and Materials Used Test ARer DC- Closed Closed Tight a Opened at Opened at nsid Repair Tight Q psid nsid RP std The above is certified to be true. Firm Name Firm Address Gauge # llate last accuracy tested Certified Tester Cent Teste No. Date White - Customer`s Copy Yellow -City Copy Pink - Tester's Copy