Loading...
2011_0725 (3)CHECK ONE: IRRIGATION DOMESTIC_ _ FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL: LOCATION OF SERVICE: ti c The baci low prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is cerdfied to be operating within acceptable parameters. C 71 Manufacturer Model Number Serial Number Reduced Pressure Principle Double Check Valve U-1 i i t% , S TYPE OF ASSEMBLY C Pressure Vacuum Breaker C Atmosphere Vacuum Breaker Size Located At The above is certified to be true. Firm Name e P ✓ `' Firm Address 0 `�) o y w 2 Gauge # Ij � I ( I Date last accuracy tested Certified Tester Cert. Tester No. &Ay i ' ,3 -/ Date i' 2 = 41 -0- 11 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check: 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Tight -2 RP -_psid Leaked ❑ Closed Tight Leaked ❑ Z , 2 Opened at osid Opened at nsid Did not Open C3 nsid Leaked C3 Reps and Materials Used Test After Repair DC- Closed Tight ❑ Closed Tight o Opened at vsid Opened at nsid nsid Rp sid if The above is certified to be true. Firm Name e P ✓ `' Firm Address 0 `�) o y w 2 Gauge # Ij � I ( I Date last accuracy tested Certified Tester Cert. Tester No. &Ay i ' ,3 -/ Date i' 2 = 41 -0- 11 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy